BECOME A MEMBER
Connecting New Zealand

Better infrastructure planning welcome

09 May 2019


The release of a prototype Infrastructure Pipeline to forecast major projects being delivered by Central Government agencies has been welcomed by New Zealand’s civil construction sector as a move towards better infrastructure planning.

Civil Contractors New Zealand Chief Executive Peter Silcock said it was a positive step because it enabled better visibility and would give New Zealand’s infrastructure industry a better idea of how to meet the needs of coming projects.

“Having the right capability and capacity at the right time and place doesn’t happen overnight,” Mr Silcock said.

“Better forecasting of the forward work programme means greater certainty about the specific needs of future work. This provides contractors with the confidence to invest in people, equipment and business systems. In turn, this helps to keep costs down.

Better work scheduling would result in more connected planning for infrastructure so capability could be retained.

He said a prime example where the pipeline would have made a difference was the gap in major tunnelling projects between the construction of the Waterview Tunnel and projects such as Auckland’s Central Interceptor and City Rail Link, where costs would have been greatly reduced if more of the capabilities developed during the Waterview Tunnel project were retained.

Mr Silcock said the prototype pipeline was a starting point rather than an end point and would be expanded through interactions with central government agencies as well as local government. This would in turn give a much clearer picture of a ‘whole of infrastructure’ work programme.

In addition to giving clearer indications of the forward work programme, the Infrastructure Pipeline also brought New Zealand one step closer to having an established ‘shop front’ for infrastructure projects, which would allow construction companies to make better decisions around which projects to bid on, he said.

The first iteration was developed in the lead-up to the establishment of the New Zealand Infrastructure Commission, Te Waihanga. It currently presents data on 174 projects from five agencies – The Department of Corrections, The Ministry of Education, The Ministry of Health, The New Zealand Defence Force and The New Zealand Transport Agency.

The data behind the pipeline will be updated quarterly and dynamically as significant projects were announced. The next update will be in early June, to reflect Budget 2019 decisions.

Mr Silcock said the initial tools for viewing planned stages of projects available on the Infrastructure Pipeline pages on the Treasury website would be extremely useful for contractors in more efficient decision making.

The prototype Infrastructure Pipeline is available on the treasury website at https://treasury.govt.nz/information-and-services/nz-economy/infrastructure/pipeline.

 

 

RELATED


Principal Business Partner
Core Associates
Major Associates
Hynds Pipe Systems
Doug the Digger
CivilShare
Solo
Turbo Staff Limited
Geofabrics New Zealand Ltd
Marley NZ Ltd
Infrastructure New Zealand
Southeys Group Auckland
Synergy Positioning Systems
Porter Group Limited
Komatsu NZ Ltd
TVH NEW ZEALAND
Connexis
Vertu Equipment Limited
SITECH NZ
Firth Certified Concrete
3PM
Assignar
Manage Company
Turners Group Ltd: Head Office/Auckland
ERoad Ltd
Winstone Aggregates
beforeUdig
First Gas
TRIG Instruments
Youngman Richardson
Terra Cat
Western Institute of Technology Limited
BNZ Partners
A B Equipment Ltd
H.J. Asmuss & Co. Ltd
SAMI Bitumen Technologies New Zealand Ltd
Global Survey - Auckland
UDC Finance
Liebherr New Zealand
Humes Pipeline Systems
Mimico NZ Ltd
TotalEnergies NZ Ltd
John Deere Limited
Wirtgen NZ Ltd
Sheet Pile Ltd
nib Advice Financial
TLC Insurance Limited
Mico New Zealand Ltd
NZ ISCA
TDX Ltd
ENZED
Waka Kotahi NZ Transport Agency
Geosynthetic Partners International Ltd
Milwaukee Tool New Zealand
MATES In Construction
TR Group
Teletrac Navman
n3

Login





Forgot password?
Create an Account