BECOME A MEMBER
Connecting New Zealand

Local water construction needs urgent action

09 Aug 2024


Civil Contractors New Zealand Chief Executive Alan Pollard has welcomed the Government’s long-awaited Local Water Done Well policies announced yesterday, but warns water contractors are suffering from an immediate lack of work and the country risks losing exceptional businesses.

Mr Pollard said while New Zealand needed to overcome its chronic underinvestment in water infrastructure, many contractors currently had no forward work past the projects they were currently performing .

“The forward programme of construction work on water networks has severely slowed, to the point where many civil construction businesses are at risk.

“On the back of this announcement, we now need councils to prioritise their water construction programmes, or we will lose skilled businesses with water construction expertise. We must retain capacity and capability in the industry if we are to carry out the required work when it does come to market.”

He said while better planning was certainly needed, there was a risk any new funding would go towards creating new organisational structures, rather than physically constructing and maintaining the country’s water networks, which should be the immediate concern.

“Many of our contractor members are not receiving forward work programme updates, meaning they are unsure if they can continue. They have been asked to scale up capacity for a large amount of work repairing, replacing and upgrading water networks – so where is the work?”

Councils now needed to use any tools they had at their disposal to bring water work programmes to market. 

Mr Pollard said that council-controlled water organisations (CCOs) played an important role but were often underfunded by councils and poorly understood by elected representatives.

“If the CCO model is to be successful, they must be properly supported and funded to enable them to carry out their duties.”

Better decision making was needed around replacing the country’s aging water networks, which were increasingly being patched and clamped rather than replaced.

“Our members are concerned the system is becoming increasingly reactive, and they are being asked to scramble to fix leaks rather than receiving well-planned forward programmes of pipe replacement from clients.” 

Long-term funding also needed attention and moves to water meter installation were critical, not only to create a sustainable long-term funding model, but also as an opportunity to fill the gap in workflow in the short term to retain industry capacity and capability.

Mr Pollard said contractors offered a unique practical perspective as the people conducting the physical works on the network for their clients in local government, and more early contractor engagement and representation at a decision-making and technical advisory level was needed for the reforms to be successful.

 

Photo credit: Michelle Hoffmann, E.N. Ramsbottom Contractors

 

 

RELATED


Principal Business Partner
Core Associates
Major Associates
Southeys Group Auckland
Prime Fluid Management
The Drug Detection Agency
H.J. Asmuss & Co. Ltd
Portacom New Zealand Limited
Geosynthetic Partners International Ltd
TDX Ltd
UDC Finance
Winstone Aggregates
Infrastructure Sustainability Council
Hynds Pipe Systems
Enviro NZ Services Ltd
Mico New Zealand Ltd
Franklin Smith Group
Sheet Pile Ltd
AWF
Marley NZ Ltd
Brandt Equipment
Westpac NZ Ltd
MIMICO NZ Ltd
Global Survey - Auckland
CSP Div of Fletcher Steel
Manage Company
Firth Certified Concrete
ALH LTD
Geofabrics New Zealand Ltd
Advice Financial
Trade Me Jobs
TotalEnergies NZ Ltd
Reliance Reinforcing Limited
RobLawMax Recruitment
New Zealand Transport Agency
BNZ Partners
Aptella
Wirtgen NZ Ltd
Northpine Ltd
Steelgal NZ Ltd
XCMG New Zealand
Milwaukee Tool New Zealand
Youngman Richardson
Assignar
Hydraulink Fluid Connecters Ltd
Checksafe Ltd
TLC Insurance Limited
Infrastructure New Zealand
Vertical Horizonz NZ Ltd
CivilShare
AECOM New Zealand Limited
Power Farming New Zealand Ltd
TR Group
Commercial Hire NZ Ltd
Blick
Parallaxx
ENZED
n3
RB Recruitment
A B Equipment Ltd
TRIG Instruments
Absolute Immigration NZ
Greenlight Insurance Brokers
Rimkus
Brolube New Zealand
Teletrac Navman
Over and Out Communications
Terra Cat
beforeUdig
Porter Group Limited
SITECH NZ
John Deere Limited
Liebherr New Zealand
A.E.L.
Central Group Forklifts & Trucks
ERoad Ltd
MBP (NZ) Ltd
Connexis
TVH NEW ZEALAND
Turners Group Ltd: Head Office/Auckland
MATES In Construction
Solo
SAMI Bitumen Technologies Pty Ltd
Fluiconnecto Ryco New Zealand Ltd
Doug the Digger
Vertu Equipment Limited
Kobelco New Zealand
Rettenmaier New Zealand Ltd
Humes Pipeline Systems
Komatsu New Zealand Ltd
Nulca NZ
Employment Hero
Holcim New Zealand Ltd
Terra Infrastructure Pty Ltd
First Gas

Login





Forgot password?
Create an Account