BECOME A MEMBER
Connecting New Zealand

$71b infrastructure investment needs certainty to go with spend

18 May 2023


The government’s announcement of an increased infrastructure investment to $71b over five years has potential to deliver results, but Civil Contractors New Zealand says the investment must come with more certainty around the work programme ahead and focus on the work at hand.

CCNZ Chief Executive Alan Pollard welcomed the new National Resilience Plan, which has an initial funding pool of $6b and a focus on building infrastructure resilience in the medium and long term for at-risk areas, and a $279m investment package for State Highways that focusses on slip prevention, flood mitigation and managing risks such as sea level rise.

He said these investments were a tangible and much-needed response so the country’s contractors could prepare for rebuild and recovery following the impact of recent severe weather events, as well as catch up with an infrastructure deficit in the hundreds of billions.

“New Zealand has taken a beating from severe weather events, which has made our massive and well-documented infrastructure deficit even worse and will require sustained funding and focus to overcome.

“It’s great to see recognition of the role well-planned preventative works can play in mitigating the damage flooding and severe weather events can wreak on our infrastructure and communities, and licence given to Waka Kotahi to carry out much needed work.”

He said more detail around the work was needed to give civil contractors the confidence they needed to invest in new and emerging technologies, and to invest in hiring and training staff. Because of this, it was important they could have confidence in a consistent a pipeline of work.

“The work that civil contractors do underpins all other parts of the construction sector, so the focus on a clearly defined and well-funded programme of work is essential if we are serious about tackling our infrastructure challenges”.  

While good support and collaboration between government and industry was important, delivering good construction outcomes would require all parties to focus on the job at hand – the construction and maintenance of the country’s infrastructure networks in the short, medium and long term.

It was all too common to see infrastructure budgets remain unspent due to holdups from changes to design, delivery, and administration. Funding was needed to finance tangible work on the ground, rather than growing the amount of government administration, he said.

“As a country, we have a lot of catching up to do. A commitment for $71b in infrastructure investment over five years can enable a lot of good work. We need to make sure it leads to actual work on the ground and leads to productive outcomes.

“There are also a lot of distractions out there, so we need to make sure our people and companies can focus on their core task of construction to achieve the good outcomes infrastructure delivers in terms of healthy, prosperous and well-connected communities.”

Mr Pollard said communities and businesses were hurting from rising costs as well as severe weather events, so mental health support was also an important consideration.

 

 

RELATED




Principal Business Partner
Core Associates
Major Associates
Solo
Humes Pipeline Systems
Holcim New Zealand Ltd
Coninnova Limited
The Drug Detection Agency
GHD Limited
Habit Health EAP
TDX Ltd
Enviro NZ Services Ltd
ERoad Ltd
Iplex Pipelines NZ
Greenlight Insurance Brokers
MIMICO NZ Ltd
SITECH NZ
Hynds Pipe Systems
Commercial Vehicle Holdings
Wirtgen NZ Ltd
Aggregates & Quarry Association
n3
ENZED
Infrastructure Sustainability Council
Fluiconnecto Ryco New Zealand Ltd
Tech 5 Recruitment Limited
Trade Me Jobs
Nulca NZ
Hydraulink Fluid Connecters Ltd
Mico New Zealand Ltd
Kobelco New Zealand
Aptella
Infrastructure New Zealand
Impac Services Limited
MBP (NZ) Ltd
Northpine Ltd
AWF
Commercial Hire NZ Ltd
Westpac NZ Ltd
Terra Infrastructure Pty Ltd
Connexis
BNZ Partners
AEL
Youngman Richardson
UDC Finance
Absolute Immigration NZ
Doug the Digger
Prime Fluid Management
Bridon Cookes
Turners Group Ltd: Head Office/Auckland
New Zealand Transport Agency
Firth Certified Concrete
H.J. Asmuss & Co. Ltd
Reliance Reinforcing Limited
OneStaff Limited
TotalEnergies NZ Ltd
Winstone Aggregates
Global Survey - Auckland
beforeUdig
Marley NZ Ltd
Norwood
TR Group
Advice Financial
Stellar Recruitment
RB Recruitment
MATES In Construction
AB Equipment Ltd
Komatsu New Zealand Ltd
SAMI Bitumen Technologies Pty Ltd
Central Group
Geosynthetic Partners International Ltd
AECOM New Zealand Limited
Liebherr New Zealand
First Gas
RobLawMax Recruitment
Building Recruitment Ltd
Remarkable People Ltd
Geofabrics New Zealand Ltd
SG Fleet
CivilShare
Rimkus
Terra Cat
Plan A
AON New Zealand
Vertical Horizonz NZ Ltd
Franklin Smith Group
Portacom New Zealand Limited
Ritchie Bros. (NZ) Limited
Over and Out Communications
Teletrac Navman
Manage Company
Porter Group Limited
Brandt Tractor Limited

Log in





Forgot password?
Create an Account