BECOME A MEMBER
Connecting New Zealand

$71b infrastructure investment needs certainty to go with spend

18 May 2023


The government’s announcement of an increased infrastructure investment to $71b over five years has potential to deliver results, but Civil Contractors New Zealand says the investment must come with more certainty around the work programme ahead and focus on the work at hand.

CCNZ Chief Executive Alan Pollard welcomed the new National Resilience Plan, which has an initial funding pool of $6b and a focus on building infrastructure resilience in the medium and long term for at-risk areas, and a $279m investment package for State Highways that focusses on slip prevention, flood mitigation and managing risks such as sea level rise.

He said these investments were a tangible and much-needed response so the country’s contractors could prepare for rebuild and recovery following the impact of recent severe weather events, as well as catch up with an infrastructure deficit in the hundreds of billions.

“New Zealand has taken a beating from severe weather events, which has made our massive and well-documented infrastructure deficit even worse and will require sustained funding and focus to overcome.

“It’s great to see recognition of the role well-planned preventative works can play in mitigating the damage flooding and severe weather events can wreak on our infrastructure and communities, and licence given to Waka Kotahi to carry out much needed work.”

He said more detail around the work was needed to give civil contractors the confidence they needed to invest in new and emerging technologies, and to invest in hiring and training staff. Because of this, it was important they could have confidence in a consistent a pipeline of work.

“The work that civil contractors do underpins all other parts of the construction sector, so the focus on a clearly defined and well-funded programme of work is essential if we are serious about tackling our infrastructure challenges”.  

While good support and collaboration between government and industry was important, delivering good construction outcomes would require all parties to focus on the job at hand – the construction and maintenance of the country’s infrastructure networks in the short, medium and long term.

It was all too common to see infrastructure budgets remain unspent due to holdups from changes to design, delivery, and administration. Funding was needed to finance tangible work on the ground, rather than growing the amount of government administration, he said.

“As a country, we have a lot of catching up to do. A commitment for $71b in infrastructure investment over five years can enable a lot of good work. We need to make sure it leads to actual work on the ground and leads to productive outcomes.

“There are also a lot of distractions out there, so we need to make sure our people and companies can focus on their core task of construction to achieve the good outcomes infrastructure delivers in terms of healthy, prosperous and well-connected communities.”

Mr Pollard said communities and businesses were hurting from rising costs as well as severe weather events, so mental health support was also an important consideration.

 

 

RELATED


Principal Business Partner
Core Associates
Major Associates
Hynds Pipe Systems
SITECH NZ
Westpac NZ Ltd
The Drug Detection Agency
Teletrac Navman
TDX Ltd
Wirtgen NZ Ltd
Kobelco New Zealand
Mico New Zealand Ltd
Holcim New Zealand Ltd
SAMI Bitumen Technologies Pty Ltd
ERoad Ltd
Hydraulink Fluid Connecters Ltd
AWF
Komatsu New Zealand Ltd
CivilShare
Coninnova Limited
Solo
Geofabrics New Zealand Ltd
TR Group
Geosynthetic Partners International Ltd
John Deere Limited
BNZ Partners
Terra Cat
Commercial Hire NZ Ltd
Absolute Immigration NZ
RB Recruitment
Trade Me Jobs
Central Group
Vertical Horizonz NZ Ltd
Turners Group Ltd: Head Office/Auckland
First Gas
Infrastructure New Zealand
Enviro NZ Services Ltd
Parallaxx
n3
Over and Out Communications
Global Survey - Auckland
Iplex Pipelines NZ
Rimkus
TotalEnergies NZ Ltd
Graymont
Aptella
Marley NZ Ltd
MIMICO NZ Ltd
Employment Hero
Nulca NZ
Portacom New Zealand Limited
Bridon Cookes
UDC Finance
Brandt Tractor Limited
MATES In Construction
Franklin Smith Group
Fluiconnecto Ryco New Zealand Ltd
AEL
beforeUdig
TRIG Instruments
New Zealand Transport Agency
Plan A
Youngman Richardson
Sheet Pile Ltd
MBP (NZ) Ltd
Manage Company
Terra Infrastructure Pty Ltd
Northpine Ltd
Liebherr New Zealand
Greenlight Insurance Brokers
Infrastructure Sustainability Council
Firth Certified Concrete
A B Equipment Ltd
Connexis
RobLawMax Recruitment
Prime Fluid Management
Winstone Aggregates
Porter Group Limited
ENZED
Advice Financial
AECOM New Zealand Limited
H.J. Asmuss & Co. Ltd
Brolube New Zealand
Humes Pipeline Systems
Doug the Digger
Reliance Reinforcing Limited
Assignar
Checksafe Ltd

Login





Forgot password?
Create an Account