BECOME A MEMBER
Connecting New Zealand

National Infrastructure Strategy ‘long overdue’

13 Oct 2021


A draft national 30-year Infrastructure Strategy has been released by the New Zealand Infrastructure Commission Te Waihanga, setting a blueprint for the country to address its massive infrastructure deficit, improve resilience and streamline infrastructure construction.

Civil Contractors New Zealand Chief Executive Peter Silcock welcomed the Draft New Zealand Infrastructure Strategy, saying it provided vital vision and direction for the country’s infrastructure networks, framing challenges and solutions in a way that was ‘long overdue’.

“It seems a glaring omission for the country to have gone so long without an overarching strategy for something as important as infrastructure. Once finalised, this strategy will inform the national approach and give industry and government more clarity on the work ahead.”

Mr Silcock said the New Zealand Infrastructure Strategy mapped out the challenges the country faces in terms of infrastructure construction and provision, and also recommends actions on key issues such as cost escalation, climate change and ongoing maintenance.

He said it would be interesting to see government’s response to the 67 recommendations provided in the strategy, which include improving water infrastructure pricing and provision, clearer long-term funding intentions and a clear national direction for waste management.

The strategy included estimates of the cost required to meet New Zealand’s infrastructure needs if the country was to ‘build itself out’ of trouble at around 9.6 per cent of GDP over a 30-year period, up from 5.5 per cent of GDP. 

Despite this, it stopped short of recommending a major build programme straight away, suggesting a clear direction and systematic change to better pay for transport and water infrastructure was needed to sustain the levels of infrastructure construction required over the coming decades. 

While a draft, the strategy sets out a proposed direction based on research and consultation. The New Zealand Infrastructure Commission Te Waihanga is now awaiting feedback from the Minister and will consider this before refining the strategy for release early next year. Once finalised, government will respond to recommendations and advice in the strategy.

The Draft New Zealand Infrastructure Strategy is currently with the Minister for Infrastructure awaiting feedback and will be finalised in early 2022.

Read the draft strategy>>

 

 

RELATED


Principal Business Partner
Core Associates
Major Associates
Brandt Equipment
Advice Financial
CivilShare
Central Group Forklifts & Trucks
Reliance Reinforcing Limited
XCMG New Zealand
TR Group
Liebherr New Zealand
Milwaukee Tool New Zealand
TRIG Instruments
UDC Finance
RB Recruitment
Vertical Horizonz NZ Ltd
TVH NEW ZEALAND
CSP Div of Fletcher Steel
Coninnova Limited
Southeys Group Auckland
Portacom New Zealand Limited
Parallaxx
Over and Out Communications
AECOM New Zealand Limited
Franklin Smith Group
Doug the Digger
Hydraulink Fluid Connecters Ltd
SAMI Bitumen Technologies Pty Ltd
TotalEnergies NZ Ltd
Connexis
Humes Pipeline Systems
Solo
Vertu Equipment Limited
Global Survey - Auckland
Firth Certified Concrete
Prime Fluid Management
Enviro NZ Services Ltd
Brolube New Zealand
Sheet Pile Ltd
Rettenmaier New Zealand Ltd
ERoad Ltd
Infrastructure New Zealand
Porter Group Limited
MBP (NZ) Ltd
Aptella
Winstone Aggregates
Infrastructure Sustainability Council
The Drug Detection Agency
Checksafe Ltd
Manage Company
Northpine Ltd
Wirtgen NZ Ltd
MATES In Construction
Employment Hero
Terra Infrastructure Pty Ltd
Komatsu New Zealand Ltd
BNZ Partners
ENZED
Absolute Immigration NZ
beforeUdig
Greenlight Insurance Brokers
John Deere Limited
AWF
First Gas
Trade Me Jobs
n3
H.J. Asmuss & Co. Ltd
MIMICO NZ Ltd
SITECH NZ
Holcim New Zealand Ltd
A B Equipment Ltd
Teletrac Navman
Rimkus
Steelgal NZ Ltd
Marley NZ Ltd
Kobelco New Zealand
Westpac NZ Ltd
Waka Kotahi NZ Transport Agency
Mico New Zealand Ltd
Terra Cat
Power Farming New Zealand Ltd
Youngman Richardson
Nulca NZ
Geofabrics New Zealand Ltd
Blick
Turners Group Ltd: Head Office/Auckland
RobLawMax Recruitment
Commercial Hire NZ Ltd
Hynds Pipe Systems
Fluiconnecto Ryco New Zealand Ltd
Geosynthetic Partners International Ltd
TLC Insurance Limited
Assignar
ALH LTD
TDX Ltd

Login





Forgot password?
Create an Account