BECOME A MEMBER
Connecting New Zealand

Pothole repair plans sensible, but underlying funding issues need clarity

18 Jul 2023


The National Party’s proposal to establish a ‘Pothole Repair Fund’ is a useful clarification of priorities and funding to replace pavements degraded by underinvestment, but it does not provide a silver bullet or set funding in place for long-term transport network maintenance.

Civil Contractors New Zealand Chief Executive Alan Pollard said the proposed fund would reallocate funding towards much-needed pavement replacements, but the focus should be on replacing tired pavements rather than spot-fixing potholes.

Long term underfunding meant road surfacing – which waterproofs the pavement underneath – had been pushed past its design life. This meant in many locations the surface had degraded to a state where the pavement beneath had suffered and needed renewal.

While the 2022 year’s large resurfacing campaign would go a long way toward waterproofing pavements that were still in good condition, in many places the network was beyond design life following years of funding roads with a 25-year design life as if they would last 200 years.

More work was needed to create a system that funds good safety outcomes in network construction and maintenance, he said.

“Do we need to embark on a major renewal programme for New Zealand’s road pavements? The answer is yes. But this would not be needed if the programme of road surfacing had been adequately funded, so it’s important we get the settings right.

“When you push the network past its design life, it is going to take more investment to bring it back up to scratch. We need better long-term funding structures in place for the construction and maintenance of our roads, or as a country, we will be worse off.”

Mr Pollard said the National Party’s proposed funding sits within the National Land Transport Programme, so it would be a reallocation of existing safety funding, and the proposal did not provide additional funding for the construction or maintenance of the transport network.

He said it was concerning to see more and more tasks that would ordinarily sit within the National Land Transport Programme ‘shuffled off’ into short-term funding pools. This demonstrated the shortcomings in the long-term funding system of road user charges and fuel excise duties used to fund road construction and maintenance.

Funding for the transport network was usually set in the Government Policy Statement for Land Transport, which was now four months overdue. Mr Pollard said this was just one of a suite of key policy documents that seemed to be stalling without progress, alongside a review of the road user charges system which had been in stasis since April 2022.

As severe weather events increase, designs must change accordingly. Given the significant damage to the network caused by severe weather events, construction of a more resilient network was needed as well as replacement of roads reaching the end of design life.

Quick fix options such as spot-fixing of potholes were sometimes necessary – but were not cost-effective. Much better would be a well-funded construction and maintenance programme including cleaning out culverts and drains, plus more robust, resilient design and increased design life of options selected for pavements and surfacing.

An ambitious programme of work was needed to provide the country with a transport network that connected communities effectively, provided a certain pipeline for a skilled road construction and maintenance workforce, and fostered economic development, he said.

“What we need from decision makers across the political spectrum is ambition to do better and commitment to long-term funding for the construction and maintenance of the country’s transport network.”

Note for journalists: what causes potholes?
The main cause of potholes is water getting into the ‘pavement’ layer below the upper asphalt or chipseal surface of the road. The pavement is the road’s foundation and is made of a specially blended aggregate designed to compact well and provide a stable base. Once water gets through the surface and into the pavement layer it acts as a lubricant and, with pressure from the traffic on top, the pavement deteriorates and potholes form.

Damage is also accelerated by heavy vehicles. An increase in vehicles’ maximum allowable weight and the additional pressure from a greater number of trucks carrying these heavier loads, combined with record breaking rainfall over the past year, has acted as one-two punch breaking down the defences of New Zealand’s road network.

Additionally, limited budgets affect the amount of annual resealing that provides a waterproof barrier to help prevent water penetration.

Waterproofing the road network is the best thing to avoid potholes forming in first place. It provides a waterproof surface and protect the pavement beneath. Potholes should be avoidable if there’s adequate investment in maintaining our roading network.

While focussed deep repair can provide a lasting solution in some cases, once the pavement has been destabilised it may be more sensible to replace the pavement in that section of road.

Repairing potholes properly takes skill and the right equipment. It’s important to avoid surfacing over flaws in the pavement as anything but a temporary fix, and it may be more sensible to renew a section of road that is reaching the end of its design life.

 

 

RELATED




Principal Business Partner
Core Associates
Major Associates
Komatsu New Zealand Ltd
Rimkus
Porter Group Limited
Remarkable People Ltd
ENZED
Manage Company
Hydraulink Fluid Connecters Ltd
Doug the Digger
Holcim New Zealand Ltd
MBP (NZ) Ltd
Westpac NZ Ltd
Norwood
Connexis
Portacom New Zealand Limited
Mico New Zealand Ltd
The Drug Detection Agency
Nulca NZ
Fluiconnecto Ryco New Zealand Ltd
TotalEnergies NZ Ltd
Prime Fluid Management
ERoad Ltd
Impac Services Limited
RB Recruitment
AB Equipment Ltd
Commercial Vehicle Holdings
GHD Limited
Marley NZ Ltd
Geofabrics New Zealand Ltd
CivilShare
Franklin Smith Group
AECOM New Zealand Limited
Habit Health EAP
Wirtgen NZ Ltd
Infrastructure New Zealand
Aggregates & Quarry Association
AEL
UDC Finance
SG Fleet
Advice Financial
Reliance Reinforcing Limited
Terra Cat
SAMI Bitumen Technologies Pty Ltd
Hynds Pipe Systems
Winstone Aggregates
Global Survey - Auckland
beforeUdig
AON New Zealand
Plan A
Site App Pro
Central Group
First Gas
TDX Ltd
Infrastructure Sustainability Council
Trade Me Jobs
Youngman Richardson
Geosynthetic Partners International Ltd
SITECH NZ
Greenlight Insurance Brokers
Enviro NZ Services Ltd
OneStaff Limited
Brandt Tractor Limited
BNZ Partners
Humes Pipeline Systems
New Zealand Transport Agency
TR Group
Solo
AWF
Firth Certified Concrete
Teletrac Navman
n3
Iplex Pipelines NZ
Commercial Hire NZ Ltd
Liebherr New Zealand
Over and Out Communications
RobLawMax Recruitment
Bridon Cookes
Kobelco New Zealand
Coninnova Limited
H.J. Asmuss & Co. Ltd
Turners Group Ltd: Head Office/Auckland
Terra Infrastructure Pty Ltd
MIMICO NZ Ltd
MATES In Construction
Aptella
Northpine Ltd
Absolute Immigration NZ

Log in





Forgot password?
Create an Account