BECOME A MEMBER
Connecting New Zealand

Submission: Health and Safety at Work Amendment Bill

23 Mar 2026


CCNZ made a submission on the Health and Safety at Work Amendment Bill, following input from members.

The submission was followed by a verbal presentation to Parliamentary Select Committee on 25 March, presented by CCNZ Communications and Advocacy Manager Fraser May, alongside Hugh Goddard of CCNZ member Pipeline & Civil. Watch the presentation>>

CCNZ submitted on the following points:
1. Clarity and Workability: The Bill’s proposed definitions, new thresholds (“critical risk”), and small business carve-outs introduce ambiguity, particularly for multi-PCBU (Person Conducting a Business or Undertaking) sites and fluctuating workforces. We are concerned about these ambiguities, and request the points raised in our detailed submission below be noted and addressed.

2. Critical Risk Focus: Sharpening the system’s focus on genuinely life-threatening risks is welcome, but in refocussing the system, we must not dilute broader duties or create perverse incentives to under-address chronic, cumulative, or psychosocial risks, all of which can be debilitating for people working in the industry.

3. Multi-PCBU Sites: The Bill must provide practical frameworks for managing overlapping duties, avoiding excessive risk transfer down the supply chain (to subcontractors and SMEs), and ensuring clients (upstream PCBUs) are held accountable for safety environments. This is a key submission point.

4. Regulatory Consistency and Guidance: Amendments must be accompanied by robust, industry-developed Approved Codes of Practice (ACOPs) and clear, accessible WorkSafe guidance tailored to horizontal construction.

5. Role of WorkSafe and other regulators: CCNZ supports the shift in role for WorkSafe, to better connect with industry best practice and support good health and safety practices rather than take a prosecution-first approach where clear standards are not in place. However, adequate resourcing will be needed if WorkSafe is to fulfil its expected functions under the new legislation and foster better understanding of what is ‘reasonably practicable’.

6. Compliance Burden: Further measures are required to address prequalification (which is used in procurement by clients to ensure contractors have effectivesystems in place for managing health and safety risk on construction work sites), duplication, administrative inefficiency, and the risk of compliance burden shifting down the supply chain, from project initiators to large contractors to SMEs.

7. Transition and Implementation: Practical, well-resourced sector guidance and transition periods are essential to manage legislative change, particularly to avoid project delays or confusion on urgent and safety-sensitive projects.

Read the full submission>>

 

 

RELATED




Principal Business Partner
Core Associates
Major Associates
First Gas
Remarkable People Ltd
RobLawMax Recruitment
Commercial Vehicle Holdings
AWF
Kobelco New Zealand
Connexis
Firth Certified Concrete
Doug the Digger
ERoad Ltd
MATES In Construction
ENZED
TR Group
Impac Services Limited
Wirtgen NZ Ltd
Mico New Zealand Ltd
Solo
TRIG Instruments
Terra Infrastructure Pty Ltd
TDX Ltd
OneStaff Limited
AON New Zealand
TotalEnergies NZ Ltd
Trade Me Jobs
Greenlight Insurance Brokers
Brandt Tractor Limited
SITECH NZ
Porter Group Limited
UDC Finance
SAMI Bitumen Technologies Pty Ltd
Infrastructure Sustainability Council
Coninnova Limited
Terra Cat
Absolute Immigration NZ
MBP (NZ) Ltd
Norwood
Geosynthetic Partners International Ltd
The Drug Detection Agency
GHD Limited
MIMICO NZ Ltd
Infrastructure New Zealand
beforeUdig
Enviro NZ Services Ltd
Portacom New Zealand Limited
CivilShare
Hydraulink Fluid Connecters Ltd
Nulca NZ
BNZ Partners
AEL
Rimkus
Aptella
Youngman Richardson
Site App Pro
Assignar
Teletrac Navman
Winstone Aggregates
Franklin Smith Group
Reliance Reinforcing Limited
Central Group
Vertical Horizonz NZ Ltd
Crediflex New Zealand Limited
Northpine Ltd
Over and Out Communications
H.J. Asmuss & Co. Ltd
Commercial Hire NZ Ltd
RB Recruitment
SG Fleet
Manage Company
New Zealand Transport Agency
Advice Financial
Turners Group Ltd: Head Office/Auckland
n3
Plan A
AECOM New Zealand Limited
Geofabrics New Zealand Ltd
Hynds Pipe Systems
Marley NZ Ltd
Humes Pipeline Systems
Iplex Pipelines NZ
Holcim New Zealand Ltd
Prime Fluid Management
Komatsu New Zealand Ltd
AB Equipment Ltd
Fluiconnecto Ryco New Zealand Ltd
Westpac NZ Ltd
Global Survey - Auckland
Liebherr New Zealand
Bridon Cookes

Log in





Forgot password?
Create an Account