BECOME A MEMBER
Connecting New Zealand

National Infrastructure Plan sets the stage for stability

25 Jun 2025


The draft National Infrastructure Plan released today signals a plan for the future, but also more stability for maintenance and renewals, in a way that can make the most of our current infrastructure assets.

“The draft plan sets a logical, reasonable path to progress, past the drastic swings we see in the infrastructure work programme when new governments are elected”, Civil Contractors New Zealand Chief Executive Alan Pollard said.

“The plan’s recommendations should enable central and local government clients to improve how they consider, fund, finance and deliver the vital roads, water networks, hospitals and other vital infrastructure we depend on, as well as providing visibility on infrastructure project needs.”

Released today by Te Waihanga New Zealand Infrastructure Commission, the draft plan sets out some of the challenges New Zealand faces in planning and delivering infrastructure.

“It was reiterated at the symposium today that maintenance work has long been deprioritised, underfunded and even ignored. Bringing local maintenance, renewal and repair works forward to fill the short-term pipeline is a priority for our industry.

“Historically, there has been a lack of priority around maintenance and renewals. But a stable long-term programme of maintenance, renewals and new infrastructure works will better serves our communities. The Plan sets appropriate priorities around this.”

The Plan also sets out some of the solutions, including better funding for maintenance, tools to streamline delivery, more sustainable funding pathways and right-sizing new investment.

Mr Pollard welcomed Minister Chris Bishop’s comments at the Infrastructure Commission symposium held today that central government is going to take a better look at its own capital-intensive government agencies, which will be held accountable for their assets going forward.

“Noting that the government owns around 40 per cent of our total infrastructure stock, the public sector must build knowledge of what infrastructure assets it owns. Many do not have asset management plans. Others are in a position where they deliberately ‘sweat’ their assets.

“We have a valuable opportunity to move past this, toward nation-shaping decision making built on consensus, which will provide more surety in upcoming work and provide real return on investment.”

CCNZ had previously raised these concerns with the Minister, including the time it was taking between the announcement of projects and when they actually hit the market.

Tools to make infrastructure delivery based around need rather than budget surplus were welcome, and Mr Pollard stressed the importance of improved interaction between central and local government, both of which hold key infrastructure delivery roles.

“We welcome efforts from the government, councils and other clients to be clearer about project delivery timeframes, and prioritise spending on renewals and maintenance,” Mr Pollard said.

“We shouldn’t just talk and theorise about infrastructure—it’s only meaningful when it’s well funded, well-built and well maintained.”

The draft National Infrastructure Plan is open for consultation and feedback until 6 August 2025.

 

 

RELATED




Principal Business Partner
Core Associates
Major Associates
Remarkable People Ltd
Westpac NZ Ltd
Hydraulink Fluid Connecters Ltd
H.J. Asmuss & Co. Ltd
Youngman Richardson
AWF
Infrastructure New Zealand
Aptella
Humes Pipeline Systems
TDX Ltd
Turners Group Ltd: Head Office/Auckland
ERoad Ltd
Solo
Portacom New Zealand Limited
Doug the Digger
Norwood
Rimkus
SAMI Bitumen Technologies Pty Ltd
Bridon Cookes
AB Equipment Ltd
Infrastructure Sustainability Council
UDC Finance
MIMICO NZ Ltd
Geosynthetic Partners International Ltd
The Drug Detection Agency
Absolute Immigration NZ
TR Group
Terra Infrastructure Pty Ltd
Kobelco New Zealand
Site App Pro
Firth Certified Concrete
CivilShare
Marley NZ Ltd
MBP (NZ) Ltd
Brandt Tractor Limited
AECOM New Zealand Limited
ENZED
AEL
Winstone Aggregates
SITECH NZ
Global Survey - Auckland
Commercial Hire NZ Ltd
Assignar
Prime Fluid Management
Mico New Zealand Ltd
Terra Cat
Vertical Horizonz NZ Ltd
RB Recruitment
n3
Wirtgen NZ Ltd
Enviro NZ Services Ltd
Over and Out Communications
RobLawMax Recruitment
Franklin Smith Group
BNZ Partners
AON New Zealand
Nulca NZ
Advice Financial
Central Group
TotalEnergies NZ Ltd
First Gas
Porter Group Limited
Crediflex New Zealand Limited
Plan A
Komatsu New Zealand Ltd
Hynds Pipe Systems
Teletrac Navman
Northpine Ltd
Manage Company
Reliance Reinforcing Limited
Connexis
Greenlight Insurance Brokers
Liebherr New Zealand
MATES In Construction
Holcim New Zealand Ltd
SG Fleet
Commercial Vehicle Holdings
Iplex Pipelines NZ
Impac Services Limited
OneStaff Limited
Trade Me Jobs
Fluiconnecto Ryco New Zealand Ltd
New Zealand Transport Agency
Coninnova Limited
TRIG Instruments
GHD Limited
beforeUdig
Geofabrics New Zealand Ltd

Log in





Forgot password?
Create an Account