BECOME A MEMBER
Connecting New Zealand

CCNZ supports review of NZS 3910

26 Nov 2020


The construction sector has taken the first formal steps towards a comprehensive review of the standard contract, NZS 3910:2013 Conditions of Contract for Building and Civil Engineering Construction (NZS 3910) which is the underlying model contract for at least 75 per cent of non-residential construction contracts in New Zealand.

With strong support from CCNZ the NZ Construction Industry Council (NZCIC) has taken the lead commissioning Standards New Zealand to run a scoping process for the review of NZS 3910. Civil Contractors New Zealand Chief Executive Peter Silcock is the NZCIC lead on this project.

Mr Silcock says the next key step is the development of a Draft Scoping Document that will be open to sector wide consultation. All NZCIC members will be included in this consultation.

"It is important we take the time to develop a clearly defined scope. This is a big and important project whichever way you look at it, so the substantive review will only commence once we have the scope well defined. At this stage we are targeting March 2020 to get that underway.”

The first step in the process was a day long workshop held on 23 November which was attended by more than 25 people representing clients (including central and local government and property developers), contractors (including head contractors and specialist trades), consultants (including engineers, architects, quantity surveyors) and government agencies (including MBIE and the NZ Infrastructure Commission).

The scoping workshop gathered important information to inform and direct the review. The key outcomes were

  • The need for a wide ranging rather than restricted scope review
  • The need for more regular reviews to ensure the standard is kept up to date
  • The identification of key themes that will drive the review
  • A section by section review identifying areas for major change
  • The need to have a user friendly “smart contract” format

Funding for the scoping project from NZCIC, Kainga Ora, Ministry of Education, KiwiRail, MBIE, Infrastructure Commission and Waka Kotahi NZTA.  For further information, email CCNZ Chief Executive Peter Silcock.

 

 

RELATED


Principal Business Partner
Core Associates
Major Associates
Sheet Pile Ltd
First Gas
Marley NZ Ltd
TLC Insurance Limited
Milwaukee Tool New Zealand
John Deere Limited
Firth Certified Concrete
ERoad Ltd
TRIG Instruments
nib Advice Financial
A B Equipment Ltd
Turbo Staff Limited
Youngman Richardson
Western Institute of Technology Limited
Humes Pipeline Systems
Porter Group Limited
Hynds Pipe Systems
Connexis
UDC Finance
Terra Cat
Mimico NZ Ltd
Doug the Digger
TR Group
H.J. Asmuss & Co. Ltd
Wirtgen NZ Ltd
BNZ Partners
Manage Company
Waka Kotahi NZ Transport Agency
Southeys Group Auckland
SAMI Bitumen Technologies New Zealand Ltd
Synergy Positioning Systems
Turners Group Ltd: Head Office/Auckland
Geosynthetic Partners International Ltd
Assignar
MATES In Construction
TDX Ltd
Winstone Aggregates
SITECH NZ
Liebherr New Zealand
Geofabrics New Zealand Ltd
Solo
ENZED
n3
3PM
Teletrac Navman
Global Survey - Auckland
NZ ISCA
CivilShare
Infrastructure New Zealand
beforeUdig
Mico New Zealand Ltd
Vertu Equipment Limited
Komatsu NZ Ltd
TotalEnergies NZ Ltd
TVH NEW ZEALAND

Login





Forgot password?
Create an Account