BECOME A MEMBER
Connecting New Zealand

Road cone obsession distracts from better safety outcomes

22 Jul 2024


Civil Contractors New Zealand Chief Executive Alan Pollard said a growing national obsession with road cones was an unhealthy distraction from the need to keep workers and road users safe on and around road work sites.

Good temporary traffic management was necessary to protect workers and road users, Mr Pollard said.

“It’s hugely important to protect the people we ask to work in high-risk locations, such as 100km/hr road corridors or trenches around utilities such as water pipes, energy cables and high-pressure gas lines – not to mention road users around these sites”.

Recent announcements around road cones and potholes were an unhelpful distraction from the real issues, as industry worked within project scope set by clients and legislation.

Contractors and clients could not avoid obligations under the Health and Safety at Work Act 2015, and the conclusions from the Ernst & Young report cited today by Auckland Mayor Wayne Brown were ‘absurd’ and an affront to everyone working in high-risk environments.

“Suggesting traffic management is deployed to maximise profit is nonsense. It’s there for one reason – to keep road users and workers safe during high-risk works,” Mr Pollard said.

While contractors were an easy target for criticism, a more collaborative approach including clients, designers and subcontractors was needed to reach better outcomes, as industry worked within health and safety legislation, enforced by WorkSafe as the regulator, with project standards and traffic management plans set by designers and clients.

There was always room for improvement, and industry had been moving toward risk-based temporary traffic management for some years. However, this would lead to better safety outcomes and appropriate on-site controls, not necessarily lower traffic management costs.

“The way sites are set up is a function of the client requirements and what is needed to meet contractor obligations under health and safety legislation. We will not and cannot compromise people’s safety. It’s something everyone needs to improve on,” he said.

Road cones were just one tool to manage safety. Full or partial road closures could provide a safe and efficient fix in some situations, such as overnight maintenance and the industry was exploring ways to better manage risk on and around work sites.

More broadly, it was concerning to see potholes, leaks and road cone reduction prioritised above renewal and replacement of aging infrastructure, with decision makers seemingly blinded by symptoms of longstanding underinvestment in the country’s transport and water networks rather than the cause, and communities paying the price.

“In terms of potholes, the real issue is the amount of roads past their design life. If the road surface is degrading, patching potholes isn’t going to provide a lasting solution. Roads need to be resurfaced not patched, or if the pavement is degrading, they need to be renewed.”

 

 

RELATED




Principal Business Partner
Core Associates
Major Associates
Commercial Hire NZ Ltd
Assignar
Humes Pipeline Systems
RB Recruitment
Trade Me Jobs
Brolube New Zealand
Nulca NZ
Checksafe Ltd
Infrastructure Sustainability Council
CivilShare
Commercial Vehicle Holdings
Firth Certified Concrete
Teletrac Navman
MBP (NZ) Ltd
Hynds Pipe Systems
Kobelco New Zealand
MATES In Construction
The Drug Detection Agency
TotalEnergies NZ Ltd
Liebherr New Zealand
ERoad Ltd
Porter Group Limited
Hydraulink Fluid Connecters Ltd
Connexis
Turners Group Ltd: Head Office/Auckland
Coninnova Limited
Vertical Horizonz NZ Ltd
Enviro NZ Services Ltd
Mico New Zealand Ltd
SITECH NZ
Central Group
AWF
OneStaff Limited
Westpac NZ Ltd
Site App Pro
SAMI Bitumen Technologies Pty Ltd
Northpine Ltd
RobLawMax Recruitment
BNZ Partners
Franklin Smith Group
Over and Out Communications
Brandt Tractor Limited
Terra Cat
Bridon Cookes
ENZED
AEL
Parallaxx
GHD Limited
Global Survey - Auckland
Portacom New Zealand Limited
Graymont
UDC Finance
n3
Absolute Immigration NZ
Geosynthetic Partners International Ltd
H.J. Asmuss & Co. Ltd
TR Group
Geofabrics New Zealand Ltd
Plan A
beforeUdig
MIMICO NZ Ltd
New Zealand Transport Agency
Reliance Reinforcing Limited
Aptella
Holcim New Zealand Ltd
Infrastructure New Zealand
Iplex Pipelines NZ
Fluiconnecto Ryco New Zealand Ltd
AECOM New Zealand Limited
Komatsu New Zealand Ltd
First Gas
Terra Infrastructure Pty Ltd
Rimkus
Youngman Richardson
Marley NZ Ltd
TDX Ltd
Manage Company
Wirtgen NZ Ltd
Remarkable People Ltd
Prime Fluid Management
Doug the Digger
TRIG Instruments
Crediflex New Zealand Limited
Advice Financial
Winstone Aggregates
Greenlight Insurance Brokers
A B Equipment Ltd
Solo

Log in





Forgot password?
Create an Account