BECOME A MEMBER
Connecting New Zealand

Revised NZTA standards and specifications

10 Sep 2025


New Zealand Transport Agency Waka Kotahi has released several updated standards and specifications over recent months.

The below list is not exhaustive, and if you would like CCNZ to address any issues or have feedback on any of the standards below, please email Technical@civilcontractors.co.nz.

Upcoming reviews

NZTA B02 - Specification for the Construction of Unbound Granular Pavement Layers
NZTA has commenced a process to review and update its suite of technical specifications related to the construction of granular pavements.  First off the block is NZTA B02 and comments are invited on the attached draft prepared by the working group. 

Recently updated

NZTA P03 Specification for First Coat Seals
This document was updated in June 2025. This specification sets out a client-prescribed method for the construction of a chip seal on a newly constructed granular basecourse pavement.

P03 specification for first coat seals is available here>>

The NZTA P04 Specification for Resealing
This was updated in June 2025. This specification for resealing sets out a client-prescribed method for the construction of a chip seal on a pavement that has an existing surfacing. It includes “second coat seals” and any subsequent chip seal layer.

The P04 Specification for reseals is available here>>

New P18 Specification for the Design of Chip Seals
A new p18 specification has been developed, taking the design methods described in Chipsealing in New Zealand and its predecessor, the Bituminous Sealing Manual and presents them in the form of a technical specification.

It’s available here>>

A new M13 specification for adhesion agents (version 2)
This M13 specification replaces the version issued in 1989, setting out the requirements for the testing and use of adhesion (anti-stripping) agents in cutback bitumen used for chip sealing.

The new M13 Specification for Adhesion Agents is available here>>

Z01 Minimum standards for quality management
The updated Z standards for maintenance and small projects are available here>>

Updated NZTA M03 specification for sub-base aggregates
M03 has now been published after development by a joint working group. This update to M03 provides for a range of material quality, or class, depending on pavement loadings. It also introduces a statistical process control approach for determining compliance with M03 particle size distribution requirements.

Read the new M03 here>>

The SM012 State highway control manual
The State Highway Control Manual was updated in May 2025. It sets out NZTA’s powers and policy with regard to state highways. The manual details procedures for protection, control, asset management and work execution.

Read the updated Manual>> 

T-series specifications

NZTA has updated its NZTA T03 Procedure for the Determination of Road Surface texture.  Version 2 sets out the means by which surface texture is quantified. It allows either the traditional “sand circle” procedure or modern vehicle-mounted instrumentation for texture measurement. This is available here>>

The NZTA T09 Procedure for the Estimation of the Kerosene Content of Cutback Bitumen has also been updated. It's available here>>

A new NZTA T31 Method of Measuring the Active Adhesion Between a Bituminous Binder and a Chip Seal Aggregate (the venerable Vialit plate adhesion test), has been produced. The new method is available here>>

If you have feedback on any of the above standards, please email Technical@civilcontractors.co.nz 

 

 

 

RELATED




Principal Business Partner
Core Associates
Major Associates
Marley NZ Ltd
OneStaff Limited
TDX Ltd
Wirtgen NZ Ltd
AWF
BNZ Partners
Holcim New Zealand Ltd
Solo
Remarkable People Ltd
MBP (NZ) Ltd
Iplex Pipelines NZ
RobLawMax Recruitment
Franklin Smith Group
Norwood
Doug the Digger
Terra Infrastructure Pty Ltd
Westpac NZ Ltd
Northpine Ltd
New Zealand Transport Agency
Turners Group Ltd: Head Office/Auckland
Humes Pipeline Systems
Plan A
Fluiconnecto Ryco New Zealand Ltd
Prime Fluid Management
Liebherr New Zealand
Firth Certified Concrete
Coninnova Limited
Geofabrics New Zealand Ltd
Enviro NZ Services Ltd
Bridon Cookes
SITECH NZ
Advice Financial
Manage Company
Geosynthetic Partners International Ltd
H.J. Asmuss & Co. Ltd
Porter Group Limited
Rimkus
Connexis
Teletrac Navman
Nulca NZ
Reliance Reinforcing Limited
Brandt Tractor Limited
Impac Services Limited
ERoad Ltd
ENZED
TR Group
Absolute Immigration NZ
SG Fleet
Komatsu New Zealand Ltd
MIMICO NZ Ltd
Aggregates & Quarry Association
RB Recruitment
Over and Out Communications
Central Group
MATES In Construction
Habit Health EAP
AECOM New Zealand Limited
UDC Finance
Infrastructure Sustainability Council
Terra Cat
GHD Limited
AON New Zealand
Mico New Zealand Ltd
CivilShare
Hydraulink Fluid Connecters Ltd
Greenlight Insurance Brokers
Kobelco New Zealand
Portacom New Zealand Limited
Commercial Hire NZ Ltd
Global Survey - Auckland
SAMI Bitumen Technologies Pty Ltd
Winstone Aggregates
First Gas
The Drug Detection Agency
beforeUdig
Tech 5 Recruitment Limited
n3
Youngman Richardson
Aptella
Hynds Pipe Systems
AB Equipment Ltd
Trade Me Jobs
Commercial Vehicle Holdings
TotalEnergies NZ Ltd
AEL
Infrastructure New Zealand

Log in





Forgot password?
Create an Account