BECOME A MEMBER
Connecting New Zealand

CCNZ supports review of NZS 3910

26 Nov 2020


The construction sector has taken the first formal steps towards a comprehensive review of the standard contract, NZS 3910:2013 Conditions of Contract for Building and Civil Engineering Construction (NZS 3910) which is the underlying model contract for at least 75 per cent of non-residential construction contracts in New Zealand.

With strong support from CCNZ the NZ Construction Industry Council (NZCIC) has taken the lead commissioning Standards New Zealand to run a scoping process for the review of NZS 3910. Civil Contractors New Zealand Chief Executive Peter Silcock is the NZCIC lead on this project.

Mr Silcock says the next key step is the development of a Draft Scoping Document that will be open to sector wide consultation. All NZCIC members will be included in this consultation.

"It is important we take the time to develop a clearly defined scope. This is a big and important project whichever way you look at it, so the substantive review will only commence once we have the scope well defined. At this stage we are targeting March 2020 to get that underway.”

The first step in the process was a day long workshop held on 23 November which was attended by more than 25 people representing clients (including central and local government and property developers), contractors (including head contractors and specialist trades), consultants (including engineers, architects, quantity surveyors) and government agencies (including MBIE and the NZ Infrastructure Commission).

The scoping workshop gathered important information to inform and direct the review. The key outcomes were

  • The need for a wide ranging rather than restricted scope review
  • The need for more regular reviews to ensure the standard is kept up to date
  • The identification of key themes that will drive the review
  • A section by section review identifying areas for major change
  • The need to have a user friendly “smart contract” format

Funding for the scoping project from NZCIC, Kainga Ora, Ministry of Education, KiwiRail, MBIE, Infrastructure Commission and Waka Kotahi NZTA.  For further information, email CCNZ Chief Executive Peter Silcock.

 

 

RELATED


Principal Business Partner
Core Associates
Major Associates
Komatsu NZ Ltd
A B Equipment Ltd
Vertu Equipment Limited
Sheet Pile Ltd
Porter Group Limited
TRIG Instruments
SAMI Bitumen Technologies New Zealand Ltd
n3
TVH NEW ZEALAND
MATES In Construction
John Deere Limited
3PM
Mimico NZ Ltd
Geosynthetic Partners International Ltd
Solo
Geofabrics New Zealand Ltd
Assignar
TDX Ltd
BNZ Partners
Humes Pipeline Systems
H.J. Asmuss & Co. Ltd
Milwaukee Tool New Zealand
Turbo Staff Limited
Connexis
Firth Certified Concrete
TR Group
Southeys Group Auckland
TLC Insurance Limited
Infrastructure New Zealand
UDC Finance
Mico New Zealand Ltd
Youngman Richardson
First Gas
Waka Kotahi NZ Transport Agency
Winstone Aggregates
Turners Group Ltd: Head Office/Auckland
NZ ISCA
ENZED
Western Institute of Technology Limited
CivilShare
Liebherr New Zealand
Hynds Pipe Systems
beforeUdig
SITECH NZ
nib Advice Financial
ERoad Ltd
Doug the Digger
Marley NZ Ltd
Teletrac Navman
Wirtgen NZ Ltd
TotalEnergies NZ Ltd
Global Survey - Auckland
Synergy Positioning Systems
Terra Cat
Manage Company

Login





Forgot password?
Create an Account