CCNZ, along with other industry organisations, engaged with Ministry for the Environment to help inform the government’s preliminary resource management reform policy around the fast tracked consenting of infrastructure projects.

Due to limited consultation timeframes, CCNZ based its submission on previous RMA reform advocacy. The fast tracked consenting bill is expected to be introduced by 7 March as part of the Government's 100-day plan, and enacted late 2024. There will also be opportunities for wider feedback from CCNZ members through a select committee process.

Key comments on fast tracking of infrastructure projects under the RMA 

  • CCNZ supports fast track consenting for infrastructure projects. It is currently too common and too costly for projects to be held up by endless and costly debate without satisfactory outcomes for any of the parties involved.

  • CCNZ notes there is precedent for fast tracking of projects in the manner suggested by the Government.

  • It is important fast-track consenting can be applied to a range of project scales. Because of this, we consider the ‘national, regional and locally significant’ approach to be appropriate (although how this is applied will need consideration). 

  • If fast tracked consenting is to become normalised, it is important there is capacity to conduct this at the appropriate scale. 

  • Poor outcomes happen when day to day infrastructure construction is passed over in favour of megaprojects / glamour projects. It is important that any fast track consenting process does not detract from ability to deliver ongoing programmes of infrastructure construction and maintenance. 

  • Fast track consenting should also consider enabling infrastructure such as quarries and cleanfill sites, to ensure projects can be conducted with reduced waste and maximum efficiency. Infrastructure projects should not be considered as separate from the regions in which they are taking place.

  • It is important that environmental impacts can be balanced, and remedial actions proposed as part of consent conditions.

  • There are several other processes involved in infrastructure project delivery (for instance land designations, access arrangements, Department of Conservation concessions, and more). These should be considered in an integrated approach alongside the wider legislative framework, if the process is truly to be streamlined.

  • It is important this process is as de-politicised in its application as it can be. Because of this, it seems appropriate for an independent entity to handle the allocation of projects, lest projects become victim to political point-scoring.

 

Read the full submission provided to the Ministry for the Environment>>

 

 

RELATED


Principal Business Partner
Core Associates
Major Associates
Humes Pipeline Systems
The Drug Detection Agency
Porter Group Limited
SITECH NZ
BNZ Partners
MATES In Construction
Reliance Reinforcing Limited
Northpine Ltd
Advice Financial
H.J. Asmuss & Co. Ltd
Hydraulink Fluid Connecters Ltd
TRIG Instruments
RobLawMax Recruitment
Marley NZ Ltd
n3
CSP Div of Fletcher Steel
Terra Cat
Brandt Equipment
TVH NEW ZEALAND
TLC Insurance Limited
Sheet Pile Ltd
Assignar
Axiom Training
Steelgal NZ Ltd
Enviro NZ Services Ltd
Coninnova Limited
John Deere Limited
Power Farming New Zealand Ltd
AWF
XCMG New Zealand
Infrastructure Sustainability Council
beforeUdig
SAMI Bitumen Technologies New Zealand Ltd
Franklin Smith Group
Teletrac Navman
Geofabrics New Zealand Ltd
Assetinsure
Liebherr New Zealand
Kobelco New Zealand
TotalEnergies NZ Ltd
Vertu Equipment Limited
Komatsu New Zealand Ltd
Manage Company
Southeys Group Auckland
Parallaxx
TDX Ltd
ERoad Ltd
Firth Certified Concrete
Holcim New Zealand Ltd
Connexis | Te Pukenga
Turners Group Ltd: Head Office/Auckland
Winstone Aggregates
Infrastructure New Zealand
First Gas
Synergy Positioning Systems
Blick
Doug the Digger
Mimico NZ Ltd
Absolute Immigration NZ
Greenlight Insurance Brokers
Youngman Richardson
Waka Kotahi NZ Transport Agency
UDC Finance
Hynds Pipe Systems
Wirtgen NZ Ltd
Solo
Capital Consulting International NZ Limited
Geosynthetic Partners International Ltd
Terra Infrastructure Pty Ltd
Vertical Horizonz NZ Ltd
AECOM New Zealand Limited
Commercial Hire NZ Ltd
CivilShare
A B Equipment Ltd
Brolube New Zealand
Portacom New Zealand Limited
Mico New Zealand Ltd
Nulca NZ
ENZED
Rettenmaier New Zealand Ltd
TR Group
Milwaukee Tool New Zealand
Global Survey - Auckland

Login





Forgot password?
Create an Account