BECOME A MEMBER
Connecting New Zealand

CCNZ AWARDS

National Awards

Otago Award Category D


Otago Award Category D

Projects with a value of over $5 million This award category is free to enter and is open to all financial members of the CCNZ Otago Branch.

Recognising excellence in the performance of Civil Contractors New Zealand (CCNZ) members in:
Hynds Construction Awards
To register for this award you need to be logged in.
Entries close: Friday, 15 May 2026

Entries are open to all members of the Otago Branch, Civil Contractors NZ. All projects entered must have been completed within the last 12 months at the date of entry. Contracts must have been completed, with completion certificates, by closing date of entries. 

Judging Process

  • The online submissions are assessed by the judges who will then conduct site visits.
  • Quality of entry - technically answered questions assists the judges to understand the project and enables elements to be assessed.  Photos (uploaded with each question) should show progress of project and enable conditions to be understood.
  • You will need to upload:
    • Certificate of practical completion
    • Evidence of client satisfaction (judges may make enquiries of the client, developer, neighbours etc.)
    • Evidence of customer satisfaction
  • Quality of work - final quality of workmanship will be viewed during on-site inspection of the project.
  • Following the site visits the judges will select the winner.
  • The entry documentation influences but does not determine the outcome.
  • The finalists all attend the Otago Branch Annual Construction Awards Dinner on 17 July at The Dunedin Town Hall where the winners of each category will be announced.

Entry Assistance:

  • Click here to download the helpsheet
  • Click here to download the project award questions
  •  Submission photos - for the purpose of showcasing your project on the night of the awards. We require 4 clearly labelled high-res hero photos of at least 1920 x 1080px or 1mb in size (maximum of 4 photos). These will be the images to represent your project to everyone in attendance. If you are unable to upload these in your entry please email them to otago@civilcontractors.co.nz, clearly specifying which project they relate to.
Key Dates
Awards entries open Now
Awards entries close 5pm Friday 15 May
Judging process begins Monday 18 May
Winners announced at the Otago Branch Awards dinner held at The Dunedin Town Hall - click to book Friday 17 July

For further info please contact:
Anna Pawsey CCNZ Otago Branch, 027 491 6797, otagochair@civilcontractors.co.nz
Eve Cooper CCNZ Southern Regional Manager, 021 906 481, eve@civilcontractors.co.nz

  • Eligibility
  • Questions

Eligibility

  1. Any project that has achieved practical completion within the past 12 months (or which will achieve practical completion on or before 15 May 2026)
  2. Entrants must include in their submission:
    1. Project details such as start and end date and value.
    2. Project summary.
    3. A copy of the Certificate of Practical Completion for the project.
    4. Evidence of client satisfaction in writing, demonstrated by a letter/email from the client.
    5. Evidence of customer satisfaction (road users, adjoining property owners, stakeholders and neighbours), e.g. examples of the customer/s receiving good project information prior to and during the project or safety briefings; or feedback from stakeholders throughout the project.
    6. A selection of five high resolution photographs are to be uploaded. These photographs will be used for the awards presentations and awards booklet.
    7. Entries need to clearly show who the entrants are, regardless of the submission being individual or joint.
    8. Entries should indicate any commercially sensitive information that should not be published.

Award Application Questions

Project Overview

In this first section, to give the judges a good overview of the project you are submitting please use drawings and pictures where appropriate.

*Please do not use any special characters when naming imagery or diagrams*


Setting up the Project - Planning and Control - 10% contribution to score

Describe the project, the unusual site conditions or constraints, and the key risks or opportunities identified. Explain the systems/planning that went into addressing these areas:

  • Project Mobilisation
  • Quality Assurance
  • Health & Safety
  • Environmental
  • Temporary Works
  • Skills/Training
  • Engineering Controls
  • Construction Programme
  • Financial Management

[If you have supporting imagery/diagrams to upload, please add the file name into the section of your entry that the image refers to. *Do not use any special characters when naming the files *]


Risk Identification - 20% contribution to score

Describe how risks were identified and mitigated:

  • Site Factors/Ground or Physical Conditions
  • Complexity of risk
  • Environment
  • Location
  • Contract Period
  • Contract Conditions
  • Climate Conditions
  • Other, e.g. Redesign

[If you have supporting imagery/diagrams to upload, please add the file name into the section of your entry that the image refers to. * Do not use any special characters when naming the files*]


Physical Works - Construction 20% contribution to score

Describe how construction factors were executed, and overall project/contract results:

  • Complexity of construction
  • Quality of construction
  • Health & Safety
  • Environmental
  • Supporting Social Outcomes, e.g. supporting local business
  • Efficiency (Budget/Timeliness)
  • Innovation

[If you have supporting imagery/diagrams to upload, please add the file name into the section of your entry that the image refers to.* Do not use any special characters when naming files*]


Client Satisfaction - 15% contribution to score

Describe the relationships, how they were managed and how any impacts were mitigated:

  • Delivery of client requirements
  • Level of client satisfaction

[If you have supporting imagery/diagrams to upload, please add the file name into the section of your entry that the image refers to.* Do not use any special characters when naming files*]


External Relationships - 15% contribution to score

Describe the relationships, how they were managed and how any impacts were mitigated:

  • Client
  • Consultant/s
  • Subcontractor/s
  • Supplier/s
  • Public
  • Other Stakeholder/s

[If you have supporting imagery/diagrams to upload, please add the file name into the section of your entry that the image refers to. * Do not use any special characters when naming files*]


Team Culture - 20% contribution to score

Describe the relationships, how they were managed and how any impacts were mitigated:

  • Collaboration
  • Team dynamics/Internal relationships
  • People development culture
  • Leadership
  • Training and development opportunities
  • Apprentice involvement

[If you have supporting imagery/diagrams to upload, please add the file name into the section of your entry that the image refers to.* Do not use any special characters when naming files*]


Marketing Statement

Supply a marketing statement of no more than 200 words giving a brief description of the entry that can be used for media releases and award publications. This statement should include the:

  • project name
  • location
  • client
  • consultant
  • contractor details
  • project commencement and completion dates.


 
Principal Business Partner
Core Associates
Major Associates
Fluiconnecto Ryco New Zealand Ltd
Commercial Hire NZ Ltd
AON New Zealand
Franklin Smith Group
New Zealand Transport Agency
The Drug Detection Agency
Liebherr New Zealand
Wirtgen NZ Ltd
Hynds Pipe Systems
Portacom New Zealand Limited
Komatsu New Zealand Ltd
Coninnova Limited
AECOM New Zealand Limited
Rimkus
Vertical Horizonz NZ Ltd
SG Fleet
AWF
OneStaff Limited
Marley NZ Ltd
Greenlight Insurance Brokers
Infrastructure New Zealand
Holcim New Zealand Ltd
n3
Northpine Ltd
Brandt Tractor Limited
CivilShare
Youngman Richardson
Advice Financial
Impac Services Limited
Kobelco New Zealand
First Gas
Doug the Digger
Global Survey - Auckland
GHD Limited
Enviro NZ Services Ltd
TDX Ltd
Hydraulink Fluid Connecters Ltd
Turners Group Ltd: Head Office/Auckland
Porter Group Limited
Aggregates & Quarry Association
Assignar
Bridon Cookes
beforeUdig
Geofabrics New Zealand Ltd
H.J. Asmuss & Co. Ltd
Reliance Reinforcing Limited
RB Recruitment
UDC Finance
Trade Me Jobs
Connexis
Infrastructure Sustainability Council
Firth Certified Concrete
RobLawMax Recruitment
MATES In Construction
Nulca NZ
Over and Out Communications
AEL
Iplex Pipelines NZ
TR Group
Commercial Vehicle Holdings
Mico New Zealand Ltd
TotalEnergies NZ Ltd
ERoad Ltd
Terra Infrastructure Pty Ltd
BNZ Partners
Central Group
ENZED
SAMI Bitumen Technologies Pty Ltd
Westpac NZ Ltd
Plan A
Manage Company
Remarkable People Ltd
Site App Pro
Norwood
Teletrac Navman
Humes Pipeline Systems
AB Equipment Ltd
Geosynthetic Partners International Ltd
Aptella
SITECH NZ
MBP (NZ) Ltd
Solo
Absolute Immigration NZ
Winstone Aggregates
MIMICO NZ Ltd
Prime Fluid Management
Terra Cat

Log in





Forgot password?
Create an Account