BECOME A MEMBER
Connecting New Zealand

CCNZ AWARDS

National Awards

Environmental Award


Environmental Award

The aim of the Environmental Award is to encourage the adoption of good environmental practices to achieve positive outcomes for the environment and the client, with special consideration of attention given to the environmental aspects to meet and/or exceed the contract requirements.

Recognising excellence in the performance of Civil Contractors New Zealand (CCNZ) members in:
Environmental Award
To register for this award you need to be logged in.
Entries close: Friday, 04 April 2025

For conditions of entry and category questions, please scroll down to view and click on the applicable tabs. 

All entries must be completed online.  No late entries will be accepted.

KEY DATES:

Award entries open

Now

Award entries close

Midnight Friday 4thApril 2025

Judging process begins

Tuesday 22ndApril 2025

Winners announced at the Nelson Marlborough branch Awards Dinner held at the Rutherford Hotel Nelson

Friday 18thJuly 2025

 

Site visits conducted May/June 2025 and interviews with project team late June 2025

Winners announced at the Awards Dinner Friday 18th July 2025

Meeting with Judges Panel – June 2025 - date, time and place to be confirmed

  • Each entrant will meet with the Judges Panel, at an arranged time in a central location. Each interview will be no longer than 45 minutes to discuss their specific project/entry and to work through the documentation.
  • At this meeting the Judges would also like to see any supporting information regarding Health and Safety commitment during the project, environmental protection/design undertaken during the construction process and any smart ideas utilised during construction.
  • If you wish to show the judges any resource consent documentation, please bring this along to your site visit or interview, do not attach this to your online entry. 
  • Eligibility
  • Questions

Eligibility

Conditions of Entry:

  • Entries are open to all CCNZ members who have completed a project in the Nelson Marlborough Region.
  • All projects should have been completed at the time of entry under formal contractual agreement (refer below if a maintenance contract).  
  • For an ongoing contract such as a long term maintenance contract, a completed portion of an ongoing contact may be submitted in the appropriate category.
  • Entries are accepted in regard to projects completed outside the region.  However, projects completed outside of the region must be run and managed by local contractors within the Nelson Marlborough area.
  • Before entering a submission for the Awards the Principle needs to be notified, and in some cases approve the submission
  • Each project requires a separate entry.  Please note, there will be a limit of two entries per company per category that any one business can submit.
  • Subcontractors may be entered as a separate entity in the appropriate category
  • Photographs are required as they often tell the story better than words. 
  • Please also upload with your entry 5 photos you would like displayed in the official powerpoint presentation shown on the night of the dinner.
  • The Awards will be announced at the Presentation Dinner Friday 18th July 2025
  • click here to download the handy helpsheet for entry submissions .

Award Application Questions

SPECIAL ENVIRONMENTAL ASPECTS

Effect of special environmental aspects affecting the contract e.g. resource consent requirements, need for protection of fauna & flora, waterways, exposed slopes etc 


ENVIRONMENTAL MANAGEMENT PLANS

Environmental management plans, administration and compliance with plans and consents etc, including Monitoring and Control Records.

Explain the key issues of the Environmental Plan and what corrective actions would be taken to remedy any defects or incidents.


TECHNIQUES AND EQUIPMENT

Special techniques and equipment required due to the environment


ENHANCEMENT OF THE ENVIRONMENT

Was the project aesthetically pleasing, improved or returned to its' natural condition?


PROJECT PROFILE

Who did you report to

Referee Contact Details

Engineer who signed off the work



 
Principal Business Partner
Core Associates
Major Associates
Plan A
Kobelco New Zealand
Infrastructure New Zealand
Assignar
Over and Out Communications
Brandt Tractor Limited
Infrastructure Sustainability Council
Aptella
Bridon Cookes
Youngman Richardson
AECOM New Zealand Limited
Enviro NZ Services Ltd
Remarkable People Ltd
Central Group
CivilShare
ERoad Ltd
Advice Financial
SG Fleet
Trade Me Jobs
beforeUdig
Westpac NZ Ltd
SITECH NZ
Crediflex New Zealand Limited
Nulca NZ
MIMICO NZ Ltd
Holcim New Zealand Ltd
BNZ Partners
Firth Certified Concrete
UDC Finance
Norwood
Commercial Hire NZ Ltd
Franklin Smith Group
Teletrac Navman
RobLawMax Recruitment
Coninnova Limited
TotalEnergies NZ Ltd
SAMI Bitumen Technologies Pty Ltd
Mico New Zealand Ltd
Portacom New Zealand Limited
Geofabrics New Zealand Ltd
Reliance Reinforcing Limited
Commercial Vehicle Holdings
The Drug Detection Agency
Rimkus
Hynds Pipe Systems
MBP (NZ) Ltd
Solo
Doug the Digger
Greenlight Insurance Brokers
First Gas
Geosynthetic Partners International Ltd
Terra Cat
Porter Group Limited
Komatsu New Zealand Ltd
Iplex Pipelines NZ
RB Recruitment
Turners Group Ltd: Head Office/Auckland
GHD Limited
Terra Infrastructure Pty Ltd
Winstone Aggregates
Connexis
MATES In Construction
TRIG Instruments
AWF
New Zealand Transport Agency
OneStaff Limited
Northpine Ltd
Site App Pro
ENZED
Liebherr New Zealand
Hydraulink Fluid Connecters Ltd
AB Equipment Ltd
Wirtgen NZ Ltd
Marley NZ Ltd
Absolute Immigration NZ
Global Survey - Auckland
AON New Zealand
H.J. Asmuss & Co. Ltd
Humes Pipeline Systems
Fluiconnecto Ryco New Zealand Ltd
Vertical Horizonz NZ Ltd
n3
Prime Fluid Management
TDX Ltd
Manage Company
AEL
TR Group

Log in





Forgot password?
Create an Account