BECOME A MEMBER
Connecting New Zealand

CCNZ AWARDS

National Awards

Environmental Award


Environmental Award

The aim of the Environmental Award is to encourage the adoption of good environmental practices to achieve positive outcomes for the environment and the client, with special consideration of attention given to the environmental aspects to meet and/or exceed the contract requirements.

Recognising excellence in the performance of Civil Contractors New Zealand (CCNZ) members in:
Environmental Award
To register for this award you need to be logged in.
Entries close: Friday, 04 April 2025

For conditions of entry and category questions, please scroll down to view and click on the applicable tabs. 

All entries must be completed online.  No late entries will be accepted.

KEY DATES:

Award entries open

Now

Award entries close

Midnight Friday 4thApril 2025

Judging process begins

Tuesday 22ndApril 2025

Winners announced at the Nelson Marlborough branch Awards Dinner held at the Rutherford Hotel Nelson

Friday 18thJuly 2025

 

Site visits conducted May/June 2025 and interviews with project team late June 2025

Winners announced at the Awards Dinner Friday 18th July 2025

Meeting with Judges Panel – June 2025 - date, time and place to be confirmed

  • Each entrant will meet with the Judges Panel, at an arranged time in a central location. Each interview will be no longer than 45 minutes to discuss their specific project/entry and to work through the documentation.
  • At this meeting the Judges would also like to see any supporting information regarding Health and Safety commitment during the project, environmental protection/design undertaken during the construction process and any smart ideas utilised during construction.
  • If you wish to show the judges any resource consent documentation, please bring this along to your site visit or interview, do not attach this to your online entry. 
  • Eligibility
  • Questions

Eligibility

Conditions of Entry:

  • Entries are open to all CCNZ members who have completed a project in the Nelson Marlborough Region.
  • All projects should have been completed at the time of entry under formal contractual agreement (refer below if a maintenance contract).  
  • For an ongoing contract such as a long term maintenance contract, a completed portion of an ongoing contact may be submitted in the appropriate category.
  • Entries are accepted in regard to projects completed outside the region.  However, projects completed outside of the region must be run and managed by local contractors within the Nelson Marlborough area.
  • Before entering a submission for the Awards the Principle needs to be notified, and in some cases approve the submission
  • Each project requires a separate entry.  Please note, there will be a limit of two entries per company per category that any one business can submit.
  • Subcontractors may be entered as a separate entity in the appropriate category
  • Photographs are required as they often tell the story better than words. 
  • Please also upload with your entry 5 photos you would like displayed in the official powerpoint presentation shown on the night of the dinner.
  • The Awards will be announced at the Presentation Dinner Friday 18th July 2025
  • click here to download the handy helpsheet for entry submissions .

Award Application Questions

SPECIAL ENVIRONMENTAL ASPECTS

Effect of special environmental aspects affecting the contract e.g. resource consent requirements, need for protection of fauna & flora, waterways, exposed slopes etc 


ENVIRONMENTAL MANAGEMENT PLANS

Environmental management plans, administration and compliance with plans and consents etc, including Monitoring and Control Records.

Explain the key issues of the Environmental Plan and what corrective actions would be taken to remedy any defects or incidents.


TECHNIQUES AND EQUIPMENT

Special techniques and equipment required due to the environment


ENHANCEMENT OF THE ENVIRONMENT

Was the project aesthetically pleasing, improved or returned to its' natural condition?


PROJECT PROFILE

Who did you report to

Referee Contact Details

Engineer who signed off the work



 
Principal Business Partner
Core Associates
Major Associates
GHD Limited
Connexis
SG Fleet
AB Equipment Ltd
Commercial Vehicle Holdings
Teletrac Navman
Solo
Plan A
MIMICO NZ Ltd
Greenlight Insurance Brokers
Vertical Horizonz NZ Ltd
Trade Me Jobs
UDC Finance
RB Recruitment
TR Group
OneStaff Limited
ERoad Ltd
Rimkus
Aptella
Humes Pipeline Systems
MATES In Construction
BNZ Partners
Wirtgen NZ Ltd
AON New Zealand
Site App Pro
New Zealand Transport Agency
Nulca NZ
Enviro NZ Services Ltd
SAMI Bitumen Technologies Pty Ltd
Aggregates & Quarry Association
Geosynthetic Partners International Ltd
Franklin Smith Group
Advice Financial
Fluiconnecto Ryco New Zealand Ltd
TotalEnergies NZ Ltd
AECOM New Zealand Limited
Hydraulink Fluid Connecters Ltd
Brandt Tractor Limited
Habit Health EAP
Assignar
Prime Fluid Management
Over and Out Communications
CivilShare
Iplex Pipelines NZ
SITECH NZ
beforeUdig
Remarkable People Ltd
Marley NZ Ltd
Reliance Reinforcing Limited
AWF
RobLawMax Recruitment
Mico New Zealand Ltd
MBP (NZ) Ltd
Westpac NZ Ltd
Coninnova Limited
ENZED
Bridon Cookes
Impac Services Limited
Norwood
Geofabrics New Zealand Ltd
n3
Turners Group Ltd: Head Office/Auckland
Manage Company
Doug the Digger
Liebherr New Zealand
Youngman Richardson
H.J. Asmuss & Co. Ltd
Terra Infrastructure Pty Ltd
Komatsu New Zealand Ltd
Kobelco New Zealand
Infrastructure Sustainability Council
Firth Certified Concrete
AEL
The Drug Detection Agency
Holcim New Zealand Ltd
Commercial Hire NZ Ltd
Porter Group Limited
Central Group
Portacom New Zealand Limited
First Gas
Winstone Aggregates
Terra Cat
TDX Ltd
Absolute Immigration NZ
Hynds Pipe Systems
Infrastructure New Zealand
Global Survey - Auckland
Northpine Ltd

Log in





Forgot password?
Create an Account