BECOME A MEMBER
Connecting New Zealand

CCNZ AWARDS

National Awards

Category 3


Category 3

Construction projects with a completed value between $500,000 and $2,000,000

Recognising excellence in the performance of Civil Contractors New Zealand (CCNZ) members in:
Construction Award
To register for this award you need to be logged in.
Entries close: Friday, 08 May 2026

**Remember**

*Assistance is only ever an email away, if you are stuck with anything please contact Grace on northland@civilcontractors.co.nz in the first instance.

* Attach good quality photos with your submission in the Supporting Documentation tab, or to individual questions to visually support specific answers.

* Where requested please upload no more than 5 pictures to best represent your entry and be considered for inclusion in the presentation shown on screen during the Awards Night (final photo selection is at the discretion of the committee)

* Videos may also be added to every submission and will be included in the entry package provided to judges but we cannot guarantee all videos will be shown on screen during the Awards Night (final video selection is at the discretion of the committee). Videos must be no longer than 60 seconds.

**Key Dates**

* 8:00am April 1st - Entries open

* 11:59pm May 8th – Entries close, no extensions (we mean it this time).

* Friday 12th June - Winners announced at the 2026 CCNZ Northland Construction Awards Dinner

**Summary of Project**

All entries must be accompanied by a summary no longer than 100 words to be read out during the Award presentation

  • Eligibility
  • Questions

Eligibility

* Projects are to be entered in appropriate category based on the completed value of the job

* All projects must have been completed during the period of 1 April 2025 to 31 March 2026

* Applications are open to organisations who are Contractor Members of the Northland Branch of CCNZ.

Award Application Questions

Project Overview

In this first section, to give the judges a good overview of the project you are submitting please use drawings and pictures where appropriate.

*Please do not use any special characters when naming imagery or diagrams*


Setting up the Project - Planning and Control - 10% contribution to score

Describe the project, the unusual site conditions or constraints, and the key risks or opportunities identified. Explain the systems/planning that went into addressing these areas:

  • Project Mobilisation
  • Quality Assurance
  • Health & Safety
  • Environmental
  • Temporary Works
  • Skills/Training
  • Engineering Controls
  • Construction Programme
  • Financial Management

[If you have supporting imagery/diagrams to upload, please add the file name into the section of your entry that the image refers to. *Do not use any special characters when naming the files *


Risk Identification - 20% contribution to score

Describe how risks were identified and mitigated:

  • Site Factors/Ground or Physical Conditions
  • Complexity of risk
  • Environment
  • Location
  • Contract Period
  • Contract Conditions
  • Climate Conditions
  • Other, e.g. Redesign

[If you have supporting imagery/diagrams to upload, please add the file name into the section of your entry that the image refers to. * Do not use any special characters when naming the files*]


Physical Works - Construction 20% contribution to score

Describe how construction factors were executed, and overall project/contract results:

  • Complexity of construction
  • Quality of construction
  • Health & Safety
  • Environmental
  • Supporting Social Outcomes, e.g. supporting local business
  • Efficiency (Budget/Timeliness)
  • Innovation

[If you have supporting imagery/diagrams to upload, please add the file name into the section of your entry that the image refers to.* Do not use any special characters when naming files*]


Client Satisfaction - 15% contribution to score

Describe the relationships, how they were managed and how any impacts were mitigated:

  • Delivery of client requirements
  • Level of client satisfaction

[If you have supporting imagery/diagrams to upload, please add the file name into the section of your entry that the image refers to.* Do not use any special characters when naming files*]


External Relationships - 15% contribution to score

Describe the relationships, how they were managed and how any impacts were mitigated.

  • Client
  • Consultant/s
  • Subcontractor/s
  • Supplier/s
  • Public
  • Other Stakeholder/s

Team Culture - 20% contribution to score

Describe the relationships, how they were managed and how any impacts were mitigated:

  • Collaboration
  • Team dynamics/Internal relationships
  • People development culture
  • Leadership
  • Training and development opportunities
  • Apprentice involvement

[If you have supporting imagery/diagrams to upload, please add the file name into the section of your entry that the image refers to.* Do not use any special characters when naming files*]


Marketing Statement

Supply a marketing statement of NO MORE THAN 100 WORDS giving a brief description of the entry that can be read out during the Awards Night presentation. This statement should include the:

  • project name
  • location
  • client
  • consultant
  • contractor details
  • project commencement and completion dates.


 
Principal Business Partner
Core Associates
Major Associates
Geosynthetic Partners International Ltd
Enviro NZ Services Ltd
Coninnova Limited
Teletrac Navman
Liebherr New Zealand
Hynds Pipe Systems
TDX Ltd
AON New Zealand
Wirtgen NZ Ltd
Solo
Crediflex New Zealand Limited
Porter Group Limited
ENZED
TotalEnergies NZ Ltd
Commercial Vehicle Holdings
Doug the Digger
Kobelco New Zealand
Brandt Tractor Limited
Over and Out Communications
MBP (NZ) Ltd
Youngman Richardson
Hydraulink Fluid Connecters Ltd
Reliance Reinforcing Limited
AEL
AWF
Geofabrics New Zealand Ltd
SITECH NZ
Remarkable People Ltd
First Gas
RobLawMax Recruitment
Plan A
TR Group
MIMICO NZ Ltd
Vertical Horizonz NZ Ltd
Manage Company
OneStaff Limited
Norwood
Terra Infrastructure Pty Ltd
H.J. Asmuss & Co. Ltd
ERoad Ltd
Aptella
Terra Cat
Central Group
CivilShare
Absolute Immigration NZ
Commercial Hire NZ Ltd
BNZ Partners
SAMI Bitumen Technologies Pty Ltd
RB Recruitment
Prime Fluid Management
Advice Financial
AECOM New Zealand Limited
Firth Certified Concrete
SG Fleet
Infrastructure New Zealand
Site App Pro
Nulca NZ
Rimkus
UDC Finance
Portacom New Zealand Limited
AB Equipment Ltd
Westpac NZ Ltd
Northpine Ltd
Connexis
GHD Limited
Infrastructure Sustainability Council
TRIG Instruments
Iplex Pipelines NZ
New Zealand Transport Agency
Assignar
n3
Humes Pipeline Systems
The Drug Detection Agency
Franklin Smith Group
Holcim New Zealand Ltd
Marley NZ Ltd
Winstone Aggregates
Greenlight Insurance Brokers
Global Survey - Auckland
Bridon Cookes
Mico New Zealand Ltd
Trade Me Jobs
Impac Services Limited
beforeUdig
Fluiconnecto Ryco New Zealand Ltd
MATES In Construction
Komatsu New Zealand Ltd
Turners Group Ltd: Head Office/Auckland

Log in





Forgot password?
Create an Account