BECOME A MEMBER
Connecting New Zealand

CCNZ AWARDS

National Awards

Category 1


Category 1

Excellence in the maintenance and management of assets, including routine maintenance projects.

Recognising excellence in the performance of Civil Contractors New Zealand (CCNZ) members in:
Construction Award
To register for this award you need to be logged in.
Entries close: Friday, 08 May 2026

**Remember**

*Assistance is only ever an email away, if you are stuck with anything please contact Grace on northland@civilcontractors.co.nz in the first instance.

* Attach good quality photos with your submission in the Supporting Documentation tab, or to individual questions to visually support specific answers.

* Where requested please upload no more than 5 pictures to best represent your entry and be considered for inclusion in the presentation shown on screen during the Awards Night (final photo selection is at the discretion of the committee)

* Videos may also be added to every submission and will be included in the entry package provided to judges but we cannot guarantee all videos will be shown on screen during the Awards Night (final video selection is at the discretion of the committee). Videos must be no longer than 60 seconds. 

**Key Dates**

* 8:00am April 1st - Entries open

* 11:59pm May 8th – Entries close, no extensions (we mean it this time).

* Friday 12th June - Winners announced at the 2026 CCNZ Northland Construction Awards Dinner

**Summary of Project**

All entries must be accompanied by a summary no longer than 100 words to be read out during the Award presentation

  • Eligibility
  • Questions

Eligibility

* Projects are to be entered in appropriate category based on the completed value of the job or entry criteria.

* All work must have been completed during the period of 1 April 2025 to 31 March 2026

* Applications are open to organisations who are Contractor Members of the Northland Branch of CCNZ.

Award Application Questions

Project Overview

In this first section, to give the judges a good overview of the project you are submitting please use drawings and pictures where appropriate.

*Please do not use any special characters when naming imagery or diagrams*


Setting up the Project - Planning and Control - 10% contribution to score

Describe the project, the unusual site conditions or constraints, and the key risks or opportunities identified. Explain the systems/planning that went into addressing these areas:

  • Project Mobilisation
  • Quality Assurance
  • Health & Safety
  • Environmental
  • Temporary Works
  • Skills/Training
  • Engineering Controls
  • Construction Programme
  • Financial Management

[If you have supporting imagery/diagrams to upload, please add the file name into the section of your entry that the image refers to. *Do not use any special characters when naming the files *


Risk Identification - 20% contribution to score

Describe how risks were identified and mitigated:

  • Site Factors/Ground or Physical Conditions
  • Complexity of risk
  • Environment
  • Location
  • Contract Period
  • Contract Conditions
  • Climate Conditions
  • Other, e.g. Redesign

[If you have supporting imagery/diagrams to upload, please add the file name into the section of your entry that the image refers to. * Do not use any special characters when naming the files*]


Physical Works - Construction 20% contribution to score

Describe how construction factors were executed, and overall project/contract results:

  • Complexity of construction
  • Quality of construction
  • Health & Safety
  • Environmental
  • Supporting Social Outcomes, e.g. supporting local business
  • Efficiency (Budget/Timeliness)
  • Innovation

[If you have supporting imagery/diagrams to upload, please add the file name into the section of your entry that the image refers to.* Do not use any special characters when naming files*]


Client Satisfaction - 15% contribution to score

Describe the relationships, how they were managed and how any impacts were mitigated:

  • Delivery of client requirements
  • Level of client satisfaction

[If you have supporting imagery/diagrams to upload, please add the file name into the section of your entry that the image refers to.* Do not use any special characters when naming files*]


External Relationships - 15% contribution to score

Describe the relationships, how they were managed and how any impacts were mitigated.

  • Client
  • Consultant/s
  • Subcontractor/s
  • Supplier/s
  • Public
  • Other Stakeholder/s

Team Culture - 20% contribution to score

Describe the relationships, how they were managed and how any impacts were mitigated:

  • Collaboration
  • Team dynamics/Internal relationships
  • People development culture
  • Leadership
  • Training and development opportunities
  • Apprentice involvement

[If you have supporting imagery/diagrams to upload, please add the file name into the section of your entry that the image refers to.* Do not use any special characters when naming files*]


Marketing Statement

Supply a marketing statement of NO MORE THAN 100 WORDS giving a brief description of the entry that can be read out during the Awards Night presentation. This statement should include the:

  • project name
  • location
  • client
  • consultant
  • contractor details
  • project commencement and completion dates.


 
Principal Business Partner
Core Associates
Major Associates
Teletrac Navman
Commercial Vehicle Holdings
GHD Limited
Over and Out Communications
MATES In Construction
Manage Company
Prime Fluid Management
Westpac NZ Ltd
Geofabrics New Zealand Ltd
Holcim New Zealand Ltd
Liebherr New Zealand
AB Equipment Ltd
AEL
Winstone Aggregates
Brandt Tractor Limited
TRIG Instruments
Vertical Horizonz NZ Ltd
AWF
Global Survey - Auckland
Porter Group Limited
Komatsu New Zealand Ltd
TotalEnergies NZ Ltd
New Zealand Transport Agency
SAMI Bitumen Technologies Pty Ltd
OneStaff Limited
RobLawMax Recruitment
Marley NZ Ltd
Terra Cat
Trade Me Jobs
Hynds Pipe Systems
Doug the Digger
CivilShare
Humes Pipeline Systems
Turners Group Ltd: Head Office/Auckland
AECOM New Zealand Limited
First Gas
Infrastructure Sustainability Council
Enviro NZ Services Ltd
Reliance Reinforcing Limited
The Drug Detection Agency
MIMICO NZ Ltd
Fluiconnecto Ryco New Zealand Ltd
SG Fleet
RB Recruitment
Portacom New Zealand Limited
Solo
Firth Certified Concrete
Nulca NZ
H.J. Asmuss & Co. Ltd
Remarkable People Ltd
ENZED
Franklin Smith Group
beforeUdig
Infrastructure New Zealand
Coninnova Limited
Norwood
Terra Infrastructure Pty Ltd
Connexis
Geosynthetic Partners International Ltd
Assignar
Central Group
TR Group
Rimkus
Iplex Pipelines NZ
Impac Services Limited
Aptella
n3
MBP (NZ) Ltd
UDC Finance
AON New Zealand
Greenlight Insurance Brokers
ERoad Ltd
Mico New Zealand Ltd
Crediflex New Zealand Limited
Advice Financial
Youngman Richardson
Wirtgen NZ Ltd
Bridon Cookes
TDX Ltd
Northpine Ltd
Absolute Immigration NZ
Kobelco New Zealand
Commercial Hire NZ Ltd
Site App Pro
SITECH NZ
Plan A
Hydraulink Fluid Connecters Ltd
BNZ Partners

Log in





Forgot password?
Create an Account