Come along and check out Firths new concrete manufacturing plant which opened in February 2020.
Numbers are limited so please confirm your interest to Kat via email bayofplenty@civilcontractors.co.nz
Full PPE will be required. Meeting point, expected duration and PPE details will be in the confirmation email.
Keys facts about the plant:
• The site took 270 days to build, and used 2545cu m of concrete and 5000 concrete blocks
• It produces up to 100cu m of concrete per hour or 900cu m of concrete per day
• The state-of-the-art plant equipment was shipped to New Zealand from Italy in more than 20 containers• Enhanced stormwater control and filter systems were installed to protect public networks
• Water is recycled on site and waste in recycled into other concrete products or used in construction projects