Submission - initial consultation on RMA fast track consenting

12 Feb 2024


CCNZ, along with other industry organisations, engaged with Ministry for the Environment to help inform the government’s preliminary resource management reform policy around the fast tracked consenting of infrastructure projects.

Due to limited consultation timeframes, CCNZ based its submission on previous RMA reform advocacy. The fast tracked consenting bill is expected to be introduced by 7 March as part of the Government's 100-day plan, and enacted late 2024. There will also be opportunities for wider feedback from CCNZ members through a select committee process.

Key comments on fast tracking of infrastructure projects under the RMA 

  • CCNZ supports fast track consenting for infrastructure projects. It is currently too common and too costly for projects to be held up by endless and costly debate without satisfactory outcomes for any of the parties involved.

  • CCNZ notes there is precedent for fast tracking of projects in the manner suggested by the Government.

  • It is important fast-track consenting can be applied to a range of project scales. Because of this, we consider the ‘national, regional and locally significant’ approach to be appropriate (although how this is applied will need consideration). 

  • If fast tracked consenting is to become normalised, it is important there is capacity to conduct this at the appropriate scale. 

  • Poor outcomes happen when day to day infrastructure construction is passed over in favour of megaprojects / glamour projects. It is important that any fast track consenting process does not detract from ability to deliver ongoing programmes of infrastructure construction and maintenance. 

  • Fast track consenting should also consider enabling infrastructure such as quarries and cleanfill sites, to ensure projects can be conducted with reduced waste and maximum efficiency. Infrastructure projects should not be considered as separate from the regions in which they are taking place.

  • It is important that environmental impacts can be balanced, and remedial actions proposed as part of consent conditions.

  • There are several other processes involved in infrastructure project delivery (for instance land designations, access arrangements, Department of Conservation concessions, and more). These should be considered in an integrated approach alongside the wider legislative framework, if the process is truly to be streamlined.

  • It is important this process is as de-politicised in its application as it can be. Because of this, it seems appropriate for an independent entity to handle the allocation of projects, lest projects become victim to political point-scoring.

 

Read the full submission provided to the Ministry for the Environment>>

 

 

RELATED


Principal Business Partner
Core Associates
Major Associates
Absolute Immigration NZ
Turners Group Ltd: Head Office/Auckland
Rettenmaier New Zealand Ltd
Vertu Equipment Limited
John Deere Limited
Geofabrics New Zealand Ltd
Doug the Digger
TR Group
Winstone Aggregates
Southeys Group Auckland
Coninnova Limited
SAMI Bitumen Technologies New Zealand Ltd
Capital Consulting International NZ Limited
Mimico NZ Ltd
Marley NZ Ltd
H.J. Asmuss & Co. Ltd
RobLawMax Recruitment
BNZ Partners
Nulca NZ
Terra Cat
Humes Pipeline Systems
Infrastructure New Zealand
The Drug Detection Agency
UDC Finance
Sheet Pile Ltd
Infrastructure Sustainability Council
AWF
AECOM New Zealand Limited
Connexis | Te Pukenga
Waka Kotahi NZ Transport Agency
Brandt Equipment
Greenlight Insurance Brokers
XCMG New Zealand
Global Survey - Auckland
Milwaukee Tool New Zealand
Wirtgen NZ Ltd
Hydraulink Fluid Connecters Ltd
Firth Certified Concrete
Vertical Horizonz NZ Ltd
Kobelco New Zealand
Franklin Smith Group
MATES In Construction
ERoad Ltd
Liebherr New Zealand
Synergy Positioning Systems
ENZED
TLC Insurance Limited
Porter Group Limited
Advice Financial
A B Equipment Ltd
Solo
Teletrac Navman
Komatsu New Zealand Ltd
CSP Div of Fletcher Steel
Assetinsure
Holcim New Zealand Ltd
CivilShare
Parallaxx
TotalEnergies NZ Ltd
TVH NEW ZEALAND
Power Farming New Zealand Ltd
Terra Infrastructure Pty Ltd
beforeUdig
TDX Ltd
Reliance Reinforcing Limited
Manage Company
Mico New Zealand Ltd
Blick
Geosynthetic Partners International Ltd
Youngman Richardson
n3
Commercial Hire NZ Ltd
SITECH NZ
TRIG Instruments
Enviro NZ Services Ltd
Assignar
Portacom New Zealand Limited
First Gas
Hynds Pipe Systems
Steelgal NZ Ltd
Brolube New Zealand
Northpine Ltd

Login





Forgot password?
Create an Account