CCNZ, along with other industry organisations, engaged with Ministry for the Environment to help inform the government’s preliminary resource management reform policy around the fast tracked consenting of infrastructure projects.

Due to limited consultation timeframes, CCNZ based its submission on previous RMA reform advocacy. The fast tracked consenting bill is expected to be introduced by 7 March as part of the Government's 100-day plan, and enacted late 2024. There will also be opportunities for wider feedback from CCNZ members through a select committee process.

Key comments on fast tracking of infrastructure projects under the RMA 

  • CCNZ supports fast track consenting for infrastructure projects. It is currently too common and too costly for projects to be held up by endless and costly debate without satisfactory outcomes for any of the parties involved.

  • CCNZ notes there is precedent for fast tracking of projects in the manner suggested by the Government.

  • It is important fast-track consenting can be applied to a range of project scales. Because of this, we consider the ‘national, regional and locally significant’ approach to be appropriate (although how this is applied will need consideration). 

  • If fast tracked consenting is to become normalised, it is important there is capacity to conduct this at the appropriate scale. 

  • Poor outcomes happen when day to day infrastructure construction is passed over in favour of megaprojects / glamour projects. It is important that any fast track consenting process does not detract from ability to deliver ongoing programmes of infrastructure construction and maintenance. 

  • Fast track consenting should also consider enabling infrastructure such as quarries and cleanfill sites, to ensure projects can be conducted with reduced waste and maximum efficiency. Infrastructure projects should not be considered as separate from the regions in which they are taking place.

  • It is important that environmental impacts can be balanced, and remedial actions proposed as part of consent conditions.

  • There are several other processes involved in infrastructure project delivery (for instance land designations, access arrangements, Department of Conservation concessions, and more). These should be considered in an integrated approach alongside the wider legislative framework, if the process is truly to be streamlined.

  • It is important this process is as de-politicised in its application as it can be. Because of this, it seems appropriate for an independent entity to handle the allocation of projects, lest projects become victim to political point-scoring.

 

Read the full submission provided to the Ministry for the Environment>>

 

 

RELATED


Principal Business Partner
Core Associates
Major Associates
TVH NEW ZEALAND
The Drug Detection Agency
Absolute Immigration NZ
Solo
Brandt Equipment
SAMI Bitumen Technologies New Zealand Ltd
John Deere Limited
MATES In Construction
Infrastructure Sustainability Council
A B Equipment Ltd
Global Survey - Auckland
RobLawMax Recruitment
Marley NZ Ltd
Kobelco New Zealand
Southeys Group Auckland
Portacom New Zealand Limited
BNZ Partners
TRIG Instruments
Northpine Ltd
Parallaxx
Turners Group Ltd: Head Office/Auckland
AECOM New Zealand Limited
Teletrac Navman
Komatsu New Zealand Ltd
Humes Pipeline Systems
Hynds Pipe Systems
TotalEnergies NZ Ltd
Connexis | Te Pukenga
Sheet Pile Ltd
Capital Consulting International NZ Limited
Youngman Richardson
CSP Div of Fletcher Steel
Commercial Hire NZ Ltd
SITECH NZ
n3
Steelgal NZ Ltd
Wirtgen NZ Ltd
Blick
Brolube New Zealand
Mimico NZ Ltd
Liebherr New Zealand
Doug the Digger
AWF
Geosynthetic Partners International Ltd
XCMG New Zealand
beforeUdig
TR Group
CivilShare
Enviro NZ Services Ltd
Assignar
Coninnova Limited
Vertical Horizonz NZ Ltd
TDX Ltd
Terra Infrastructure Pty Ltd
Firth Certified Concrete
Synergy Positioning Systems
Infrastructure New Zealand
ENZED
Nulca NZ
Manage Company
Porter Group Limited
Milwaukee Tool New Zealand
Hydraulink Fluid Connecters Ltd
Greenlight Insurance Brokers
H.J. Asmuss & Co. Ltd
Terra Cat
TLC Insurance Limited
Geofabrics New Zealand Ltd
Franklin Smith Group
Assetinsure
UDC Finance
Advice Financial
Winstone Aggregates
Vertu Equipment Limited
Reliance Reinforcing Limited
Power Farming New Zealand Ltd
First Gas
Rettenmaier New Zealand Ltd
Mico New Zealand Ltd
Holcim New Zealand Ltd
ERoad Ltd
Waka Kotahi NZ Transport Agency

Login





Forgot password?
Create an Account