BECOME A MEMBER
Connecting New Zealand

Shovels at the ready, but where’s the work?

20 Jul 2020


Construction and infrastructure industry leaders are calling for urgency around the release of the government’s full list of ‘shovel-ready projects’ as increasing numbers of workers face redundancy and business confidence amongst construction and infrastructure companies nose-dives.

Early this month the Government announced it had selected 150 projects worth NZD$2.6b that would create or retain 20,000 jobs. But four weeks later, only 30 projects worth about NZD$500m (approximately 25 per cent of the total allocated) had been released. A package including NZD$761m of three waters funding had also been announced, but without any timelines.

Civil Contractors New Zealand Chief Executive Peter Silcock said while the civil construction industry welcomed funding announcements and wanted to take the lead in driving post COVID-19 employment and economic recovery, details were urgently needed, or people would lose their jobs.

There was a big difference between making announcements and providing meaningful employment opportunities through economic activity, Mr Silcock said.

“The current situation is incredibly frustrating. We know the work is out there, but unless we know where, what and most importantly when projects will start, contractors are left totally in the dark. They will have no choice but to put workers off or face the risk of companies going under.”

He said employers had been waiting months for shovel-ready jobs and needed certainty to invest in people. Every week’s delay meant more would lose their jobs. A joint letter from industry leaders was sent to ministers in mid-June stating the urgent need. Ministers responded that answers were ‘imminent’, but the actual project details were still trickling out slowly, he said.

Infrastructure New Zealand Chief Executive Paul Blair said companies were running out of options.

“The drop off in well-signalled work across local councils and the private sector means industry is disproportionately dependent upon central government. All those small but steady jobs in local areas across the country help sustain employment in between big jobs that make front pages. They’re very important. That’s why industry was so pleased with the shovel-ready announcements.”

Mr Blair said timing was everything. Projects starting construction today had planners, designers and architects at work last year. Contractors began allocating resources, scaling up or down based on predictions of work. The problem now was that no one could see six to 12 months ahead, so they were taking risks retaining staff on assumptions work would appear or having to cut back hours.

“It’s very stressful, it’s increasing costs and it’s completely avoidable. The full list and timing of shovel ready projects needs to be released now with a clear commitment to project timeframes.”

Association of Consulting and Engineering Chief Executive Paul Evans said the situation was looking dire as local government cut spending on infrastructure projects, and unless urgent action was taken, the infrastructure and construction industries stood to lose a huge amount of skilled workers.

“We've seen this happen before. From 1987 into the early 90s, thousands of jobs were shed, creating a capability crisis lasting a decade, whose ripples remain today. The loss of skill and capacity in engineering and construction meant under-investment in critical infrastructure.”

Mr Evans said right now the industry could not create employment opportunities, and was instead adding people to the unemployment list. A June ACE New Zealand survey indicated 46 per cent of engineering consulting firms were experiencing cashflow and financial issues.

He said forty-five per cent had been considering cutting staff – the average loss was estimated at 15 per cent of the workforce. This was likely to have increased since June, with flow-on effects across the whole of the economy.


Update: A list of 59 of the 150 projects was published to the Crown Infrastructure Partners Website on 23 July. CCNZ, Infrastructure NZ and ACE NZ are continuing to follow up.

 

 

RELATED




Principal Business Partner
Core Associates
Major Associates
The Drug Detection Agency
Westpac NZ Ltd
Crediflex New Zealand Limited
Doug the Digger
Teletrac Navman
Assignar
GHD Limited
n3
Prime Fluid Management
Portacom New Zealand Limited
RB Recruitment
Liebherr New Zealand
Terra Infrastructure Pty Ltd
TR Group
Turners Group Ltd: Head Office/Auckland
Hydraulink Fluid Connecters Ltd
Brolube New Zealand
Solo
Greenlight Insurance Brokers
Bridon Cookes
Marley NZ Ltd
ERoad Ltd
Terra Cat
Norwood
AECOM New Zealand Limited
Franklin Smith Group
Absolute Immigration NZ
Global Survey - Auckland
Parallaxx
Commercial Vehicle Holdings
RobLawMax Recruitment
MBP (NZ) Ltd
TRIG Instruments
Over and Out Communications
Coninnova Limited
Checksafe Ltd
Geofabrics New Zealand Ltd
Vertical Horizonz NZ Ltd
Porter Group Limited
Wirtgen NZ Ltd
Aptella
First Gas
Graymont
CivilShare
Manage Company
Hynds Pipe Systems
Rimkus
beforeUdig
MIMICO NZ Ltd
Youngman Richardson
OneStaff Limited
ENZED
TotalEnergies NZ Ltd
SAMI Bitumen Technologies Pty Ltd
Geosynthetic Partners International Ltd
Commercial Hire NZ Ltd
Infrastructure New Zealand
Humes Pipeline Systems
Central Group
Advice Financial
Infrastructure Sustainability Council
Site App Pro
Connexis
Firth Certified Concrete
Kobelco New Zealand
Enviro NZ Services Ltd
AEL
BNZ Partners
MATES In Construction
Plan A
New Zealand Transport Agency
Holcim New Zealand Ltd
UDC Finance
H.J. Asmuss & Co. Ltd
AWF
Remarkable People Ltd
Reliance Reinforcing Limited
Iplex Pipelines NZ
TDX Ltd
Northpine Ltd
Nulca NZ
Fluiconnecto Ryco New Zealand Ltd
Brandt Tractor Limited
Trade Me Jobs
AON New Zealand
AB Equipment Ltd
SITECH NZ
Winstone Aggregates
Mico New Zealand Ltd
Komatsu New Zealand Ltd

Log in





Forgot password?
Create an Account