BECOME A MEMBER
Connecting New Zealand

Shovel-ready infrastructure projects needed

02 Dec 2019


The weekend announcement of the Government’s plans to bring projects forward and lift spending on significant infrastructure projects in the short to medium term is welcome news for Kiwi civil contractors and communities.

Civil Contractors New Zealand Chief Executive Peter Silcock said Finance Minister Grant Robertson’s announcement to “significantly increase spending on infrastructure” boded well for communities, contractors and their employees, and recognised infrastructure’s importance in boosting the economy and improving living standards.

“We need to get on with the job of overcoming our infrastructure deficit, so this announcement is very welcome. It’s also a necessary move to save jobs which are on the line as major transport projects wind down.”

Mr Silcock said the civil construction workforce was project-based, so the lack of short to medium term work had been a major concern for the industry as jobs like Transmission Gully, the Waikato Expressway, and Kaikoura and Christchurch motorway projects are completed over the next year.

While a clear vision and economic outcomes were important, shovel-ready projects were needed now. Significant infrastructure projects could be decades in planning and design. Because of this, he anticipated some of the wide range of transport projects put on the back burner over the past two years would need to be brought off the shelf to fill the gap.

He said workers needed projects starting over the next year they could transition to, so the focus should be on construction-ready projects, maintenance and improvements, not projects that might or might not happen in five years’ time, he said.

“Contractors are people of action. There has been a lot of announcements and talk but until funding is confirmed and planning approval granted construction work can’t start. We really need projects we can start work on over the next year.

“We’ve seen a lot of transport projects stalling in the past two years, and some of the other work has been slow to come to the market – including safety improvements and investment in rail and road maintenance. We appreciate there has been a shift in vision and priorities, but the infrastructure work pipeline is a long-term thing that doesn’t change overnight.”

Mr Silcock said projects to be brought forward could include Melling Link in Wellington’s Hutt Valley, Tauranga’s Northern Link which is “pretty much ready to go”, Cambridge to Piarere and increased investment in safety improvements and State Highway maintenance.

He said the industry was “up to the challenge” and while announcements didn’t always materialise immediately into work, contractors were keenly anticipating announcement of which initiatives were identified by Treasury to be brought forward.

The Government’s announcement indicated the details of the infrastructure investment package will be outlined at the Budget Policy Statement on 11 December.

 

 

RELATED


Principal Business Partner
Core Associates
Major Associates
Mico New Zealand Ltd
Vertical Horizonz NZ Ltd
n3
XCMG New Zealand
Portacom New Zealand Limited
Terra Infrastructure Pty Ltd
Geofabrics New Zealand Ltd
TDX Ltd
Firth Certified Concrete
Southeys Group Auckland
Connexis | Te Pukenga
Enviro NZ Services Ltd
AWF
John Deere Limited
Solo
CivilShare
Manage Company
Hydraulink Fluid Connecters Ltd
Assignar
TR Group
Northpine Ltd
BNZ Partners
Winstone Aggregates
Franklin Smith Group
Rettenmaier New Zealand Ltd
Brolube New Zealand
Infrastructure Sustainability Council
TotalEnergies NZ Ltd
Advice Financial
Power Farming New Zealand Ltd
CSP Div of Fletcher Steel
Youngman Richardson
Axiom Training
Global Survey - Auckland
Holcim New Zealand Ltd
TRIG Instruments
Capital Consulting International NZ Limited
Steelgal NZ Ltd
Coninnova Limited
TLC Insurance Limited
Parallaxx
Assetinsure
Marley NZ Ltd
Absolute Immigration NZ
ENZED
Sheet Pile Ltd
SITECH NZ
Doug the Digger
ERoad Ltd
Mimico NZ Ltd
Wirtgen NZ Ltd
Liebherr New Zealand
Turners Group Ltd: Head Office/Auckland
Geosynthetic Partners International Ltd
Kobelco New Zealand
Komatsu New Zealand Ltd
Blick
Hynds Pipe Systems
AECOM New Zealand Limited
Greenlight Insurance Brokers
Vertu Equipment Limited
Reliance Reinforcing Limited
Commercial Hire NZ Ltd
Infrastructure New Zealand
The Drug Detection Agency
H.J. Asmuss & Co. Ltd
Brandt Equipment
Waka Kotahi NZ Transport Agency
Terra Cat
Teletrac Navman
First Gas
Milwaukee Tool New Zealand
Porter Group Limited
beforeUdig
MATES In Construction
A B Equipment Ltd
TVH NEW ZEALAND
Te Pūkenga trading at WITT
UDC Finance
SAMI Bitumen Technologies New Zealand Ltd
Nulca NZ
Humes Pipeline Systems
Synergy Positioning Systems

Login





Forgot password?
Create an Account