BECOME A MEMBER
Connecting New Zealand

Government yet to fill gap in infrastructure pipeline

11 Feb 2019


Short-term gaps in the infrastructure pipeline are causing long-term headaches for the country’s civil infrastructure contractors, who have criticised a vague forward work programme that sees roading projects down nearly three billion dollars in the next two years.

Civil Contractors New Zealand Chief Executive Peter Silcock said despite promises of ‘record investment’ and a ‘year of action’ from the Government, poor visibility over new projects coming to market was starting to have a serious impact.

As projects such as Auckland’s northern and southern corridor improvements, the Waikato Expressway, Peka Peka to Otaki and Transmission Gully wind down, these should be replaced by the next wave. But the only major NZTA projects confirmed so far were the $360m SH1 Papakura to Bombay improvements, Mt Messenger Bypass and the Manawatu Gorge Replacement, with a much smaller than anticipated range of small regional improvements, Mr Silcock said.

While it was understandable a new Land Transport Policy Statement would need some adjustment time, it was also important for new projects to come to market in a reasonable timeframe, he said.

“An about-turn of infrastructure policy was always going to be challenging. The reality is we have not seen the promised array of small to medium sized regional improvements come to market or had a reasonable indication of when much of the work will begin.”

New Zealand’s regions had long been overlooked and would welcome a new selection of roading work to replace the former Roads of National Significance projects in addition to new funding sources from the Provincial Growth Fund, he said.

The lack of a clear roading work programme was just one delay, with many areas seeming to be eternally in discussion or under review.

Although the country desperately needed to improve coastal infrastructure resilience, water and broadband networks, the Government also had to deliver a coherent water infrastructure work programme following the Three Waters Review and the creation of a new independent infrastructure body.

Despite some massive projects across the Auckland region such as the Central Interceptor and Auckland Transport Alignment Project, arguments over how to proceed and reluctance to consider alternate funding models were causing counterproductive delays when the city was playing catch-up and improvements were needed, he said.

“We know there’s a lot of work to be done, and we want to be able to get on with it. The country’s skilled workforce of civil construction workers is ready and waiting, and New Zealand needs work that’s happening on the ground here and now rather than over the horizon.”

 

 

RELATED


Principal Business Partner
Core Associates
Major Associates
Porter Group Limited
TLC Insurance Limited
Youngman Richardson
Enviro NZ Services Ltd
Assignar
Geofabrics New Zealand Ltd
Firth Certified Concrete
The Drug Detection Agency
TRIG Instruments
Coninnova Limited
beforeUdig
H.J. Asmuss & Co. Ltd
Holcim New Zealand Ltd
Sheet Pile Ltd
SITECH NZ
Mico New Zealand Ltd
AECOM New Zealand Limited
TR Group
XCMG New Zealand
Winstone Aggregates
Te Pūkenga trading at WITT
n3
BNZ Partners
Vertu Equipment Limited
Rettenmaier New Zealand Ltd
Turners Group Ltd: Head Office/Auckland
Milwaukee Tool New Zealand
Infrastructure New Zealand
ENZED
Greenlight Insurance Brokers
Reliance Reinforcing Limited
TVH NEW ZEALAND
CivilShare
Mimico NZ Ltd
Kobelco New Zealand
AWF
Absolute Immigration NZ
First Gas
UDC Finance
TotalEnergies NZ Ltd
Brandt Equipment
Axiom Training
Capital Consulting International NZ Limited
Hynds Pipe Systems
SAMI Bitumen Technologies New Zealand Ltd
Portacom New Zealand Limited
Connexis | Te Pukenga
Liebherr New Zealand
John Deere Limited
Franklin Smith Group
Southeys Group Auckland
Komatsu New Zealand Ltd
Manage Company
Steelgal NZ Ltd
ERoad Ltd
Power Farming New Zealand Ltd
Northpine Ltd
Waka Kotahi NZ Transport Agency
CSP Div of Fletcher Steel
Vertical Horizonz NZ Ltd
Synergy Positioning Systems
Infrastructure Sustainability Council
Assetinsure
Commercial Hire NZ Ltd
A B Equipment Ltd
Humes Pipeline Systems
Parallaxx
Teletrac Navman
Wirtgen NZ Ltd
TDX Ltd
RobLawMax Recruitment
Geosynthetic Partners International Ltd
Blick
Nulca NZ
Global Survey - Auckland
Marley NZ Ltd
Doug the Digger
MATES In Construction
Brolube New Zealand
Terra Cat
Hydraulink Fluid Connecters Ltd
Terra Infrastructure Pty Ltd
Solo
Advice Financial

Login





Forgot password?
Create an Account