BECOME A MEMBER
Connecting New Zealand

Government yet to fill gap in infrastructure pipeline

11 Feb 2019


Short-term gaps in the infrastructure pipeline are causing long-term headaches for the country’s civil infrastructure contractors, who have criticised a vague forward work programme that sees roading projects down nearly three billion dollars in the next two years.

Civil Contractors New Zealand Chief Executive Peter Silcock said despite promises of ‘record investment’ and a ‘year of action’ from the Government, poor visibility over new projects coming to market was starting to have a serious impact.

As projects such as Auckland’s northern and southern corridor improvements, the Waikato Expressway, Peka Peka to Otaki and Transmission Gully wind down, these should be replaced by the next wave. But the only major NZTA projects confirmed so far were the $360m SH1 Papakura to Bombay improvements, Mt Messenger Bypass and the Manawatu Gorge Replacement, with a much smaller than anticipated range of small regional improvements, Mr Silcock said.

While it was understandable a new Land Transport Policy Statement would need some adjustment time, it was also important for new projects to come to market in a reasonable timeframe, he said.

“An about-turn of infrastructure policy was always going to be challenging. The reality is we have not seen the promised array of small to medium sized regional improvements come to market or had a reasonable indication of when much of the work will begin.”

New Zealand’s regions had long been overlooked and would welcome a new selection of roading work to replace the former Roads of National Significance projects in addition to new funding sources from the Provincial Growth Fund, he said.

The lack of a clear roading work programme was just one delay, with many areas seeming to be eternally in discussion or under review.

Although the country desperately needed to improve coastal infrastructure resilience, water and broadband networks, the Government also had to deliver a coherent water infrastructure work programme following the Three Waters Review and the creation of a new independent infrastructure body.

Despite some massive projects across the Auckland region such as the Central Interceptor and Auckland Transport Alignment Project, arguments over how to proceed and reluctance to consider alternate funding models were causing counterproductive delays when the city was playing catch-up and improvements were needed, he said.

“We know there’s a lot of work to be done, and we want to be able to get on with it. The country’s skilled workforce of civil construction workers is ready and waiting, and New Zealand needs work that’s happening on the ground here and now rather than over the horizon.”

 

 

RELATED


Principal Business Partner
Core Associates
Major Associates
Marley NZ Ltd
Mico New Zealand Ltd
Solo
John Deere Limited
Connexis | Te Pukenga
Geosynthetic Partners International Ltd
ERoad Ltd
TR Group
beforeUdig
Blick
Coninnova Limited
Youngman Richardson
Southeys Group Auckland
BNZ Partners
H.J. Asmuss & Co. Ltd
AWF
Power Farming New Zealand Ltd
Assetinsure
CivilShare
Brandt Equipment
Axiom Training
Advice Financial
Greenlight Insurance Brokers
Infrastructure New Zealand
Komatsu New Zealand Ltd
Franklin Smith Group
Hydraulink Fluid Connecters Ltd
Doug the Digger
Geofabrics New Zealand Ltd
Assignar
XCMG New Zealand
Kobelco New Zealand
RobLawMax Recruitment
Terra Cat
Waka Kotahi NZ Transport Agency
Enviro NZ Services Ltd
First Gas
Absolute Immigration NZ
Liebherr New Zealand
UDC Finance
Capital Consulting International NZ Limited
Vertu Equipment Limited
Terra Infrastructure Pty Ltd
Hynds Pipe Systems
Commercial Hire NZ Ltd
Global Survey - Auckland
A B Equipment Ltd
Rettenmaier New Zealand Ltd
Turners Group Ltd: Head Office/Auckland
Holcim New Zealand Ltd
Wirtgen NZ Ltd
TotalEnergies NZ Ltd
AECOM New Zealand Limited
MATES In Construction
Firth Certified Concrete
Parallaxx
Teletrac Navman
TRIG Instruments
Milwaukee Tool New Zealand
Steelgal NZ Ltd
Mimico NZ Ltd
Porter Group Limited
Portacom New Zealand Limited
Brolube New Zealand
CSP Div of Fletcher Steel
TVH NEW ZEALAND
Humes Pipeline Systems
SAMI Bitumen Technologies New Zealand Ltd
Synergy Positioning Systems
Northpine Ltd
Nulca NZ
Winstone Aggregates
TDX Ltd
SITECH NZ
Infrastructure Sustainability Council
TLC Insurance Limited
Manage Company
n3
Reliance Reinforcing Limited
Sheet Pile Ltd
The Drug Detection Agency
Vertical Horizonz NZ Ltd
ENZED

Login





Forgot password?
Create an Account