BECOME A MEMBER
Connecting New Zealand

Forecast shows national infrastructure pipeline needs work

30 Jul 2018


Kiwi civil contractors warn that while a recent construction forecast looks to steady the ship, the current course risks an underwhelming response to major challenges and losing talent to a booming overseas infrastructure markets.

The National Construction Pipeline Report 2018 forecasts future building and construction activity across New Zealand, covering a six-year period to 2023.

Civil Contractors New Zealand (CCNZ) Chief Executive Peter Silcock said while marginal increases in infrastructure investment are planned and may give contractors confidence to invest for future growth, more is needed to tackle challenges resulting from increased severe weather events, population growth and chronic underinvestment in New Zealand’s water infrastructure.

“While it’s good to see steady long-term growth, a lot of this is coming from increased residential development. Marginal increases for major projects simply aren’t enough to tackle the challenges we’re facing in our water and transport infrastructure.”

Mr Silcock said CCNZ was also concerned transport infrastructure construction expenditure would reduce in the short term as design, consenting and preparatory work for new projects over the next two to three years would be needed to prepare for the Government’s shift in focus from state highways to light rail and rapid transit.

“Most of the work on the ground won’t begin for several years. This is a serious concern for contractors. Planning and consenting work for major infrastructure projects needs to start now for work intended to start in 2023.”

Mr Silcock said while promising language features heavily in the report, it remains to be seen how this will be put into practice across local government, where a substantial gap between intentions and activity can often be seen and work on the ground rarely matches forecasts.

He said the Office of the Auditor General had repeatedly raised concerns around local government spending less than projected on capital projects, including new infrastructure and major upgrades. In the 2015/16 audit results, local authorities spent only 70 per cent of what was budgeted for capital expenditure, with little improvement in the 2016-17 results.

Any reduction in projects on the ground would come at a critical time when infrastructure work on Australia’s east coast is booming, and New Zealand looked set to lose talent and capabilities across the Tasman if projects were not moved forward to bridge the lull in project work.

Despite these concerns, contractors welcomed the the report, which placed a focus on consistent workflow and development of skills – important factors for contractors in planning future investment in their people, plant and systems, Mr Silcock said.

“It’s great to see appreciation of key concerns such as the need for steady workflow and industry training pathways coming through so strongly in the National Construction Pipeline Report. These have been major concerns for the industry and if they can be addressed correctly, we will have a future to look forward to.”

The report can be viewed online at www.mbie.govt.nz/info-services/building-construction/skills-innovation-productivity/national-construction-pipeline.

 

 

RELATED


Principal Business Partner
Core Associates
Major Associates
Parallaxx
Coninnova Limited
beforeUdig
ENZED
Nulca NZ
John Deere Limited
Komatsu New Zealand Ltd
Humes Pipeline Systems
Porter Group Limited
Mico New Zealand Ltd
Vertical Horizonz NZ Ltd
Kobelco New Zealand
Assetinsure
Geofabrics New Zealand Ltd
Reliance Reinforcing Limited
CivilShare
Turners Group Ltd: Head Office/Auckland
BNZ Partners
Portacom New Zealand Limited
Youngman Richardson
Waka Kotahi NZ Transport Agency
Rettenmaier New Zealand Ltd
Blick
Brolube New Zealand
Sheet Pile Ltd
Synergy Positioning Systems
Advice Financial
Hydraulink Fluid Connecters Ltd
CSP Div of Fletcher Steel
TLC Insurance Limited
Solo
Absolute Immigration NZ
A B Equipment Ltd
Franklin Smith Group
Teletrac Navman
Steelgal NZ Ltd
Wirtgen NZ Ltd
Terra Cat
First Gas
Northpine Ltd
Global Survey - Auckland
Firth Certified Concrete
XCMG New Zealand
Enviro NZ Services Ltd
Doug the Digger
Brandt Equipment
Liebherr New Zealand
Assignar
Milwaukee Tool New Zealand
RobLawMax Recruitment
TRIG Instruments
Capital Consulting International NZ Limited
TDX Ltd
n3
H.J. Asmuss & Co. Ltd
Greenlight Insurance Brokers
Commercial Hire NZ Ltd
TotalEnergies NZ Ltd
SITECH NZ
AWF
ERoad Ltd
Manage Company
UDC Finance
Infrastructure New Zealand
Geosynthetic Partners International Ltd
Vertu Equipment Limited
Hynds Pipe Systems
Holcim New Zealand Ltd
The Drug Detection Agency
Connexis | Te Pukenga
Winstone Aggregates
SAMI Bitumen Technologies New Zealand Ltd
Marley NZ Ltd
AECOM New Zealand Limited
TR Group
Southeys Group Auckland
TVH NEW ZEALAND
MATES In Construction
Axiom Training
Power Farming New Zealand Ltd
Mimico NZ Ltd
Infrastructure Sustainability Council
Terra Infrastructure Pty Ltd

Login





Forgot password?
Create an Account